
Temposonics
®
R-Series
V
POWERLINK
Operation Manual
I 21 I
5. Operation
5.1 Initial start-up
The position sensor R-Series
V
POWERLINK transfers position
and velocity values via the POWERLINK output. POWERLINK is
an Industrial Ethernet interface and is managed by the Ethernet
POWERLINK Standardization Group (EPSG). The sensor and the
corresponding XDD file (XML Device Description) are certified by
EPSG.
32:(5/,1./('VWDWXV
MS/ER
NS/RN
Port 1
Port 2
Condition indicator
'HYLFHVWDWXV/('
MS/ER
NS/RN
*UHHQ
5HG
,QIRUPDWLRQ
OFF
ON
- Number of magnets differs from
FRQğJXUDWLRQ
3RZHUVXSSO\RXWVLGHVSHFLğFDWLRQ
OFF
Flashing
,QYDOLGFRQğJXUDWLRQRIWKHVHQVRU
- Internal error
%XVVWDWXV/('
(when the sensor is started up, these statuses run through)
MS/ER
NS/RN
*UHHQ
5HG
,QIRUPDWLRQ
Flash
evenly
OFF
Basic Ethernet Mode
Single
ĠDVK
OFF
Preoperational Mode 1
2× single
ĠDVK
OFF
Preoperational Mode 2
3× single
ĠDVK
OFF
Ready to operate
ON
OFF
Connection establishment completed,
sensor connected to controller
%XVHUURU/('
MS/ER
NS/RN
5HG
,QIRUPDWLRQ
ON
POWERLINK communication error
3RUW/$
MS/ER
NS/RN
*UHHQ
5HG
,QIRUPDWLRQ
ON
OFF
Connection to the next network node
established
Flashing
OFF
Connection to the next network node
established & communication active
3RUW/$
MS/ER
NS/RN
*UHHQ
5HG
,QIRUPDWLRQ
ON
OFF
Connection to the next network node
established
Flashing
OFF
Connection to the next network node
established & communication active
5.2 LED status
A diagnostic display on the lid of the sensor informs about the current
status of the sensor. The R-Series
V
POWERLINK is equipped with
three LEDs:
• LED for status indication (condition indicator)
• LED for activity of the Ethernet connection at port 1 (Link Activity)
• LED for activity of the Ethernet connection at port 2 (Link Activity)
NOTICE
Observe during commissioning
1. Before initial switch-on, check carefully if the sensor has been
connected correctly.
2. Position the magnet in the measuring range of the sensor during
fi rst commissioning and after replacement of the magnet.
3. Ensure that the sensor control system cannot react in an uncon-
trolled way when switching on.
4. Ensure that the sensor is ready and in operation mode after
switching on. The bus status LED is green.
5. Check the preset span start and end values of the measuring
range (see chapter 4.4) and correct them via the customer’s
control system, if necessary.
Fig. 27: LED status display, part 1
Fig. 28: LED status display, part 2