7.3 Loading
First, turn the machine head to this position, install the blade on the machine head, tighten the
blade fixing bolts, and then install the bucket on the machine head and press the barrel fixing jig,
as shown in the above figure. Put the material into the bucket, the best loading capacity is
70%~80% of the bucket volume.
For this parts, we will send video for your reference by mail.