
9
5. Operation
Notes on operation :
1. Fill the pure or R.O water in the water tank.
Open the tank cover and remove the water tank then fill the pure or R.O water into
tank, and set back it to the unit to according to P.6.
2. Power Supply
2-1 After finishing electric work according to P.3, open the tank cover and pull the back
side panel to the direction of arrow as shown below.
2-
2 Push the electrical leakage breaker ‘’On’’.
Close the back side panel.
2-3 Switch on the power switch on the display panel.
Electrical
leakage
breaker
Back side panel
2-4. An alarm will sound when the power is supplied, then the display shows the
standby operation status as shown below.
Summary of Contents for HU-24
Page 16: ...16 Air inlet port Pre filter ...
Page 32: ...32 Wiring diagram ...