7 Maintenance
Maschinenfabrik Reinhausen GmbH 2020
63
5788897/03 EN
VACUTAP
®
VVS
®
7.2 Maintenance intervals
WARNING
Danger of explosion!
If pending maintenance work is not carried out immediately, this may lead to
death or serious injury as a result of a progressive short circuit, for example.
► Adherence to the following maintenance intervals is mandatory.
Interval
Action
After 300,000 switching operations (mo-
tor-drive unit counter reading)
Maintenance of the on-load tap-changer.
Contact the Maschinenfabrik Rein-
hausen GmbH Technical Service [
After 500,000 switching operations (mo-
tor-drive unit counter reading)
Contact the Maschinenfabrik Rein-
hausen GmbH Technical Service [
Table 6: Maintenance plan
A label on the inside of the door of the TAPMOTION® ED motor-drive unit
also specifies the relevant maintenance interval.
Figure 52: Label showing maintenance intervals
Summary of Contents for VACUTAP
Page 1: ...On load tap changer VACUTAP VVS Operating Instructions 5788897 03 EN ...
Page 82: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 82 5788897 03 EN VACUTAP VVS 9 Drawings ...
Page 93: ......
Page 94: ......
Page 95: ......