7
Operating Instructions and Owner’s Manual
Mr. Heater | Forced Air Propane Construction Heater
SIZE AND CAPACITY OF PROPANE
CYLINDERS REQUIRED
The charts below show the approximate size of the cylinder
required for these heaters. To use the chart:
1. Select the lowest air temperature expected (at the bottom of
the chart).
2. Move straight up to time of operation desired (left side of
chart).
3. Read the cylinder size required.
All heaters should have:
full cylinders
good air circulation
no frost on cylinders
MAXIMUM OPERATING TIME - HOURS
MAXIMUM OPERATING TIME - HOURS
MAXIMUM OPERATING TIME - HOURS
55,000 BTU/HR (16.1 kW)
85,000 BTU/HR (33.4 kW)
125,000 BTU/HR (49.1 kW)
AIR TEMPERATURE -
o
F (
o
C)
AIR TEMPERATURE -
o
F (
o
C)
AIR TEMPERATURE -
o
F (
o
C)
Use liquid
withdrawal
and a vaporizer