DCA-150SSVU— OPERATION AND PARTS MANUAL (STD)— REV. #1 (06/03/03) — PAGE 41
WARNING:
WARNING:
WARNING:
WARNING:
WARNING:
The engine's exhaust contains harmful
emissions.
ALWAYS have adequate
ventilation when operating. Direct exhaust
away from nearby personnel.
DCA-150SSVU — GENERATOR START-UP PROCEDURE (MANUAL)
Figure 45. Load Connections
NEVER! manually start the engine with the
main, GFCI or auailliary circuit breakers in
the ON (closed) position.
CAUTION:
1. Be sure and place the
main, G.F.C.I. and aux. circuit
breakers (Figure 44) in the “OFF” position prior to starting
the engine.
Before Starting
Generator and Control Panel
Figure 44. Main, Aux. and GFCI
Circuit Breakers
2. Connect the load to the
UVWO terminals or auxiliary
receptacles as shown in Figure 45. These load
connection points can be found on the output terminal
panel. To gain access to the UVWO terminals or other
power receptacles, unlock the access cover and lift the
door.
The UVWO terminals are protected by a plastic cover,
remove this cover to gain access to the terminals.
Tighten terminal nuts securely to prevent load wires from
slipping out.
3. Close all engine enclosure doors (Figure 46).
Figure 46. Engine Enclosure Doors
5. Place the voltage selector switch in the desired voltage
position (Figure 48).
Figure 48. Voltage Selector Switch
4. Verify that the coolant alarm lamp is OFF (Figure 47), and
the generator is placed on a
flat level surface.
Figure 47. Coolant Alarm Lamp
Go to Discount-Equipment.com
to order your parts