Operating Procedures
13
4 Operating Procedures
4.1 Mounting/Fixing
Ensure that installation, servicing and adjustment is only per-
formed by qualified personnel.
−
Install with the ICM in the vertical position.
−
Mount the ACMU using the mounting lugs provided.
−
Make sure the pressure gauge is visible at all times.
−
Enable access to all monitoring points.
−
Protect the ACMU against corrosion or aggressive environ-
ments if necessary.
4.2 Hydraulics
−
The inlet of the ACMU is the suction side of the pump, it
is a 1/4"BSP inlet (also supplied with 1/4BSP to 7/16th JIC
adaptor).
−
Connect the suction side of the pump to the reservoir by
means of a hydraulic hose, use the correct internal diame-
ter e.g. 1/4".
−
It is advantageous to provide a positive head of pressure (this
aids the priming of the pump).
Summary of Contents for ACMU
Page 1: ...ACMU UserGuide 200 189 EN www mpfiltri co uk ...
Page 8: ...8 Variants Figure 1 Product map C version ...
Page 10: ...10 Variants Figure 3 Product map for P version ...
Page 11: ...Variants 11 2 4 Installation dimensions P version Figure 4 Dimensions for P version ...
Page 44: ...Appendix H 44 Clean working practises ...
Page 48: ...48 ...
Page 50: ......