1. OVERALL DIMENSIONS (continued)
5/29
NT 1004-H00 10 16 SLS24 i - SLS36 i e
SLS24
i - SLS36 i
with heating jacket
FOR
A
TEX PUMPS, SEE INSTRUCTIONS NR 1071.
For the other sides, see the overall dimensions plan ‘SLS24 i - SLS36 i with
flanges/connections’.
W
eight : + 8 kg
JACKET CONNECTION 1" B.S.P
.F
LIQUID
STEAM
The entry connection may be connected to one or two point
s.
The outlet connection may be connected to one or two point
s.
If it is done at 1 point, purge the air at the second point.