2.5
Mounting the Mounting Bracket to the Wall
NOTE:
This is an optional equipment. See
Optional Equipments on page 10
information.
Procedure:
1
Position the bracket in a desired position, and mark the location of the mounting holes on the
wall surface.
CAUTION:
Ensure that the area behind the mounting surface is free from electrical
wires, cables, or pipes before cutting, drilling, or installing the mounting screws.
2
Mount the bracket to the wall using the appropriate mounting hardware required such as wall
material fixture.
3
Drill based on the mounting holes markings on the wall.
4
To secure the bracket, install the mounting hardware over the mounting holes on the bracket
tightly.
NOTE:
It is recommended to use a 10–16 x 1.5 inch. tapping screw and washer (not
included) on the wood stud and solid-flat concrete or brick wall.
5
To mount the two brackets, place both brackets closely and align vertically to each other.
6
To mount more than two brackets, mount each pair of the brackets with a minimum distance of
50 mm vertically and 140 mm horizontally.
MN007338A01-AE
Chapter 2 : Charger Operations
14