Pole diameters of 25mm (1”) to 50mm (2”) can be accommodated by inverting the back of the
bracket as shown in Figure 17.
Figure 17 - Mounting to pole diameters 25mm (1”) to 50mm (2”)
When adjustment is complete tighten all bolts to 14Nm (11lb ft).
Warning:
Do not over tighten the bolts as bracket failure may occur.
The enclosure and mounting brackets of the PTP 600 Series Bridge product range are
capable of withstanding wind speeds up to 151mph (242kph). The installer should ensure that
the structure the bridge is fixed to is also capable of withstanding the prevalent wind speeds
and loads. See Section 11 “Wind Loading”.
The integral safety loop should be used both for hoisting the ODU up a mast or building and
into position, and also as a fixing point to secure a permanent safety lanyard from the
tower/building to the ODU in case of mounting failure.
Figure 18 - Integral Safety Loop
Summary of Contents for MotoWI4 PTP 600 Series
Page 1: ...PTP 600 Series User Guide MOTOROLA POINT TO POINT WIRELESS SOLUTIONS ...
Page 2: ......
Page 20: ...18 ...
Page 87: ...85 Figure 34 VLAN Configuration Fields ...
Page 90: ...88 Figure 37 Save Configuration File Screen ...
Page 99: ...97 8 3 3 Detailed Counters Page Figure 43 Detailed Counters Page ...
Page 110: ...108 Figure 49 Fixed Frequency Operation ...
Page 165: ...163 Figure 97 Lower Grounding Configuration ...
Page 180: ...178 Figure 105 Connectorized 600 Series bridge Disarm Installation Page ...
Page 199: ...197 Figure 116 Diagrammatically Showing the E1 T1 Connections ...
Page 201: ...199 Figure 117 Typical Mast Installation with the addition of the E1 T1 cable ...
Page 204: ...202 Figure 119 Surge Arrestor ALPU ORT Connection Illustration ...
Page 211: ...209 Figure 132 64 QAM 0 92 Dual Payload Figure 133 256 QAM 0 81 Dual Payload ...