Installation Guide
11
2.5.1 Wall Mount Procedure - New Installation
This section describes a new AP-8132 installation with no previous access point existing on the intended wall
surface.
1.
Place the access point against the wall, ensuring the access point’s Motorola Solutions “bat wings” logo
is in the correct orientation.
2.
Mark the screw hole locations 152mm (6 in.) apart on the access point’s long axis or 40mm (1.57 in.) apart
on the access point’s short axis, depending on the intended deployment orientation of the unit.
3.
At each point, drill a hole in the wall and insert the anchor.
4.
Place the access point on the anchor. Insert screws through into the anchor.
5.
If required, install and attach a Kensington security cable (customer supplied) to the unit’s lock port.
6.
Cable the access point using either the Power Injector solution (AP-PSBIAS-2P3-ATR) or the approved
AP-8132 power supply (PWRS-14000-247R).
For Motorola Power Injector installations:
a.
Connect a RJ-45 CAT5e (or CAT6) Ethernet cable between the network data supply (host) and the
Power Injector
Data In
connector.
b.
Connect a RJ-45 CAT5e (or CAT6) Ethernet cable between the Power Injector
Data & Power Out
connector and the access point’s GE1/POE port.
c.
Ensure the cable length from the Ethernet source (host) to the Power Injector and
access point does not exceed 100 meters (333 ft). The Power Injector has no On/Off power switch.
The Power Injector receives power as soon as AC power is applied.
For standard power adapter (non Power Injector) and line cord installations:
a.
Connect a RJ-45 Ethernet cable between the network data supply (host) and the access point’s
GE1/POE or GE2 port.
b.
Verify the power adapter is correctly rated according to the country of operation.
c.
Connect the power supply line cord to the power adapter.
d.
Attach the power adapter cable into the power connector on the access point.
e.
Attach the power supply line cord to a power supply
.
7.
Attach supported 2.4 GHz or 5 GHz antennas to the connectors. For more information on supported
AP-8132 antennas, see
AP-8132 Antenna Options on page 17
.
8.
Verify the access point is receiving power by observing the LEDs are lit or flashing. For more information
on AP-8132 LED behavior, see
LED Indicators on page 19
.
NOTE
When pre-drilling a hole the recommended hole size is 4mm (0.16in.).
Summary of Contents for AP-8132
Page 1: ...AP 8132 Access Point INSTALLATION GUIDE ...
Page 2: ...2 AP 8132 Access Point ...
Page 53: ...Installation Guide 53 ...