Version 1.5
© Openpath 2021
9
To power locking hardware without an external supply (Wet Relay), select 12V or 24V,
and connect locking hardware to NO and GND (for fail secure locks) or NC and GND
(for fail safe locks).
Figure 4 Wet Relay example
To use external power, select DRY and use NO or NC and C, and wire to external
supply.
Figure 5 Dry Relay example
PROVISIONING THE SDC
Provisioning the SDC means registering it in the Control Center and getting it up and
running with the latest firmware. You will need to re-provision in the case of
Note:
If you're provisioning SDCs for a customer account, the customer org will need
to be created first.
REQUIREMENTS
l
Meet all
l
Connect the ACU to the Internet via Ethernet