background image

INDEX

1) General Safety Regulations

2) Description

3) Technical Specifications

4)  System Description

5) Accessories

6) Installation Tools

7) Installation 

8) Maintenance

9) Repairs

................................................................................ pág. 01

......................................................................................................... pág. 02

..................................................................................... pág. 03

........................................................................................... pág. 03

........................................................................................................ pág. 04

................................................................................................. pág. 04

 

 ........................................................................................................... pág. 05

....................................................................................................... pág. 10

................................................................................................................ pág. 10

Summary of Contents for BRAVO524

Page 1: ...AUTOMATION SYSTEMS FOR SLIDING GATES Operating and installation instructions English BRAVO524 v1 1 Rev 10 2019...

Page 2: ...afety Regulations 2 Description 3 Technical Specifications 4 System Description 5 Accessories 6 Installation Tools 7 Installation 8 Maintenance 9 Repairs p g 01 p g 02 p g 03 p g 03 p g 04 p g 04 p g...

Page 3: ...EN 12453 and EN 12445 11 Before attempting any job on the system cut electrical power 12 Make sure that the earthing system is perfectly constructed and connect metal parts of the means of the closur...

Page 4: ...n the motor is not operating A release system enables the gate to be moved by hand in case of malfunction or emergency The automated system was designed and built for controlling sliding gates Do not...

Page 5: ...of the automated operator Power supply V Motor Rated absorbed power W Max speed m sec Force Working time Noise Thermal reset Operating temperature C Protection class Thermal protection C Leaf max wei...

Page 6: ...te 1 To lay down electric cables use rigid and or flexible adequate tubes 2 To avoid any kind of interference always separate low voltage connection cables from AC230V power cables 3 The description o...

Page 7: ...gate moves uniformly and correctly without any irregular friction during its entire travel The soil must permit sufficient stability for the expansion plugs securing the foundation plate Remove any l...

Page 8: ...ck if the plate is perfectly horizontal 7 4 Positioning the operator Lay the electric cables to connect motor to accessories and power supply as shown in Fig 4 To facilitate making the connections all...

Page 9: ...ance of the operator from the gate by referring to Fig 13 7 6 Fixing operator Fix the operator slightly tightening the screws as shown in Fig 14 After fixing the motor install battery holder Fig 16 fi...

Page 10: ...ter the upper cover fixed please install the side cover Fig 21 7 7 Releasing the operator Prepare the operator for manual operating mode as described below Insert supplied key on the lock turn it cloc...

Page 11: ...he closed position b Positioning the first rack part to be bolted supported on the pinion and with help of the level and clamping tool keep it horizontally leveled c Move the gate to manually back and...

Page 12: ...on the limit swicth plate on the rack In this closed position the plate should trigger the limit switch of the motor b Tighten the screws DIN912 M5x12 included in the pack until it touches the rack sq...

Reviews: