![Motorline professional SLIDE1024 User'S And Installer'S Manual Download Page 9](http://html1.mh-extra.com/html/motorline-professional/slide1024/slide1024_users-and-installers-manual_1838657009.webp)
8
1
2
3
5
6
7
7
6
8
4
EN
MOTOR INSTALLATION
03. INSTALLATION
Insert the key into the lock, rotate it 90º and pull to unlock the motor (see page 7B).
After the motor is unlocked, you can open and close the gate manually.
*
If you are installing the motor
on an existing foundation,
screw the fixing plate to the
floor using suitable screws and
anchor bolts (not supplied in
the kit).
1
Insert the screws and anchor bolts into the four holes of the fixing plate and tighten.
2
With the cement still fresh, apply the fixing plate.
*
If installing the motor on an existing foundation, fasten the fixing plate to the floor using screws
and anchor bolts (not supplied in the kit).
NOTE • It is important to leave one or more tubes to pass electrical cables through the plate.
3
Using a level, make sure the plate is perfectly horizontal. The fixing plate must be placed 90 °
to the gate to ensure that the rack and pinion fit perfectly.
4
Route the electrical cables to connect the motor to the accessories and power. Leave cables
with a length that ensures easy connection to the control board.
5
Adjust the distance between the plate and the gate.
6
Position the motor on the plate leaving it centered with it and tighten the screws.
7
Screw the cover.
8
After attaching the cover, fit the protective cover of the two visible screws.
CEMENT MUST
BE FRESH
60mm
60mm