![Motorline professional SLIDE1024 User'S And Installer'S Manual Download Page 13](http://html1.mh-extra.com/html/motorline-professional/slide1024/slide1024_users-and-installers-manual_1838657013.webp)
12A
12B
EN
EN
• Check support plate
• Check rack
• Lubricate
Make sure that the supports remain
securely attached to the pillars and gate for
proper operation of the equipment.
These maintenance measures must be carried out within 6 months to maintain the correct
operation of the automation.
Make sure that the distance
between rack and motor
remains unchanged and that it
engages the teeth of the motor
pinion correctly (over time,
some distortion may occur).
Make sure that the rack remains
securely attached to the gate.
Lubricate with fine oil, all
gate movement systems /
shafts.
To detect which components are faulty, it is sometimes necessary to perform tests with a direct connec-
tion to an external power supply (24V ac battery).
The diagram below shows how this connection should be made.
NOTES:
• In order to carry out the tests, you do not need
to remove the automation from the place where
it is installed, because this way you can see if the
automatism connected directly to the external
battery can work correctly.
• As soon as you connect the
wires to a 24V battery, the motor
must operate to one of the
directions. To test the reverse
movement, change the position
of the wires connected to the
battery.
All tests must be carried out by specialized technicians due to the serious danger related
to the misuse of electrical systems!
04. COMPONENT TEST
MOTOR TEST
MAINTENANCE
05. MAINTENANCE