background image

7A

7B

295mm

529mm

60mm

60mm

11

16

14

15

17

12

13

EN

EN

To  ensure full operation of the automatism, pay  attention the following recommendations:

• Read the entire manual at least once giving special attention to all notices marked 

with        ;

• Check that the gate structure is sufficiently resistant;

• The gate should be very well leveled and have a uniform movement without irregular 

friction during the full course;

• The foundation to create in step 02 should be very resistant to support the mounting 

screws of the plate; 

• It is recommended that all locksmith works are carried out before proceeding with 

installation of the automatism.

• Check if the size and weight of the gate correspond with the presented with the 

technical data of the motor (p. 6B). 

INSTALLATION SITE PREPARATION

INSTALLATION SITE PREPARATION  

04. INSTALLATION  

04. INSTALLATION  

SITE INSTALLATION – CREATE FOUNDATION  

NOTE:

For correct operation of the automatism, it is necessary to pay attention to the dimensions 

given in the following images.  Also check that the fixation plate is parallel to the gate.

01 

• Make a hole in the ground to create a foundation in concrete. The dimensions 

shown are these recommended to create the foundation. You must leave tubes in the 

middle of the hole for the passage of cables for power and accessories, as shown in the 

detail of image 11.

02 

• Fill the hole with fresh concrete and 

smooth the top part where you will fix the 

plate.

03 

• Attach the screws to the plate with 

nut and counter nut as shown in picture 

13.

04 

• Insert the plate with screws in the concrete while it is still fresh and level it 

horizontally with a level. Also align it parallel to the gate, keeping a distance of 60mm 

between them, as visible in picture 16.

05 

• Let the concrete dry so that the plate stays well fixed.

DETAIL 11

EN

EN

Summary of Contents for BRAVO500

Page 1: ...v4 3 REV 05 2022 EN USER S AND INSTALLER S MANUAL EN BRAVO500...

Page 2: ...icable in countries with recycling systems This marking on the product or literature indicates that the product and electronic accessories eg Charger USB cable electronic material controls etc should...

Page 3: ...e mechanism GENERAL WARNINGS This manual contains very important safety and usage information very important Read all instructions carefully before beginning the installation usage procedures and keep...

Page 4: ...USERS Keep this manual in a safe place to be consulted whenever necessary If the product has contact with fluids without being prepared it must immediately disconnect from the power supply to avoid sh...

Page 5: ...ng screws to the plate 05 04 fixing screws to the ground 06 01 fixation plate 07 02 fixation plate of the limit switches 08 01 user s manual 09 02 photocells 10 02 remote controls 11 01 Control board...

Page 6: ...The dimensions mm of automatism BRAVO 500 are the following So that the automation will operate normally close the unlock and turn the key to the original position Close the cover 06 to finish make a...

Page 7: ...TION 04 INSTALLATION 04 INSTALLATION SITE INSTALLATION CREATE FOUNDATION NOTE For correct operation of the automatism it is necessary to pay attention to the dimensions given in the following images A...

Page 8: ...Mark the place to make the holes for the bushings Must make the mark at the center of the oval holes of the plate 03 Drill four holes with 18mm on foun dation Place M10 steel anchors on the holes 03 A...

Page 9: ...er end of the rack rests on top of the pinion and weld the other spacer to the gate 06 Open the gate to support the point of the new piece of rack on top of the pinion and weld the spacer 07 Remove th...

Page 10: ...with a level 02 Fasten the support of the rack over the pinion to the gate 03 Close the gate a bit until the other end of the rack rests on top of the pinion and fasten the other support 05 Open the...

Page 11: ...chanical limit switch is activated when the plate is in contact with the spring The magnetic limit switch is activated when the magnet is aligned with the motor reader Fig 45 03 Move the gate to the c...

Page 12: ...important to use stoppers on the opening and closing of the gate If this is not respected there may be danger of the gate open too much in manual mode and jump out of the rail It is important to use j...

Page 13: ...em by connecting directly to power supply in order to find out if it has problems see page 11A 3 If the motor works the problem is from control board Pull it out and send it to our MOTORLINE technical...

Page 14: ...y 2 To detect if the malfunction is on the control board or on the motor is sometimes necessary to perform tests with connection directly to a 110V 230V power supply For this it is necessary to interp...

Reviews: