background image

INTRODUCTION TO THE BOILER

General description of the boiler

The wall hung gas boiler is a fuel gas-consuming appliance which has the role of

turning the fuel gas power into thermal energy through burning.

This appliance runs unsupervised due to its protection and control systems.

The boiler is made of many parts that we are going to describe in the following

chapters.

The gas enters inside the boiler through the gas feeding circuit made of a coupling

and a reducing valve which will be set at 20 mbar for G20 A(L) and A(H) subgroups.

The reducing valve will be set at 37 mbar for LPG (propane subgroups and propane-

butane mixtures). Thus it gets into the gas valve which has the role of controlling the

gas discharge at the outlet to the burner.

The ignition achieves by flame activating by an ignition electrode, by means of

an ignition transformer.

During the combustion, the flame sensing is made by an ionization sensor.

The boiler type with forced draft is provided with a fan which evacuates the

exhaust gases. In the initiation phase, this evacuates an air volume to provide an

unexplosive ignition. The explosive ignition may occur due to a gas storage from the

non-operating period.

The combustion chamber, as a plate parallelotope, interior ceramics fibre-lined,

is designed to allow the transfer to the exchanger with less heat leakages.

In case of the CH circuit of the two heat exchangers type, the heat resulted from

fuel gas ignition is taken over by the monothermal heat exchanger and sent to the

thermal agent (water) which is delivered by the circulating pump through the heating

installation. In case of on the DHW circuit, a water discharge is detected by the

flowmeter, the 3- way gas valve is energized. The 3- way gas valve achieves the

transition from the central heating circuit on the short circuit through the plate heat

exchanger (the main plate heat exchanger) and the heat transfer is realized by means

of this to the DHW circuit (the secondary plate heat exchanger).

The scavenging is realized by means of the fan.

The running protection and control are performed electronically. The boiler setting

is made from the control board (see the chapter concerning this subject).

DESCRIPTION OF THE BOILER

3

BOILER

TYPE

C15 SPV 24 MEFM

Useful power

Accessories

[kcal/h]

The fan

The pump

The

expansion

vessel

DHW

instant

production

20670

X

X

X

X

SYMBOLS

S- with instant production of DHW (without cumulation)
P- with pump
V-with closed expansion vessel
24-the maximum power output in kW
M- the burner is supplied by a continuous modulating valve
E- the ignition and the control of the flame are electronically-made
F-the forced scavenging
M-monothermal

OPTIMUS MT

Summary of Contents for C15SPV 24MEFM

Page 1: ...lexandru cel Bun Neamt District Postal Code 617511 Romania Phone 40 233 24 17 46 233 24 19 33 Fax 40 233 24 19 29 E mail www motan ro office vaduri kober ro TECHNICAL INSTRUCTIONS FOR INSTALLATION USA...

Page 2: ...ditional facilities that may be obtained by Handing over to the beneficiary Recommendations for the yearly checking Marking documents packing storage transport quality and warranty conditions Marking...

Page 3: ...tope interior ceramics fibre lined is designed to allow the transfer to the exchanger with less heat leakages In case of the CH circuit of the two heat exchangers type the heat resulted from fuel gas...

Page 4: ...o be consulted by the new user installer In case of some components damaging there will be used only the original components You must have the manufacturer s acceptance to use some components from ano...

Page 5: ...ption Weight Heat exchanger output 0 5 i 3 bar 40 80 C 3 4 1 2 3 4 275 415 700 850 7 L Central heating Minimum and maximum admitted pressure Temperature on the heating circuit Connections inlet outlet...

Page 6: ...the copper pipe 14x1 is stainless made forced or atmospherics with 11 cannular inclines and it runs with fuel gas NG or LPG The burner output is set in a modulated system by means of a gas modulating...

Page 7: ...line the relief valve of the circuit is designed to reduce the pressure from the heating circuit and to open at 3 bars full pressure the ventilation circuit of the installation is made of an air rele...

Page 8: ...er of the boiler running see the attached drawing the measuring and pilot cells of the functional parameters for the boiler which sends the temperature signal to the electronic control block of the he...

Page 9: ...stallation we must be aware of the hydraulic features of the pump 9 The hydraulic characteristic of the pump Pressure pump P mca Pump output Q mc h the third stage of the speed the second stage of the...

Page 10: ...nstalling activities It is important to pay attention to the pipes dimensions head losses and heating elements while designing the heating system The installation filling up must be done with softened...

Page 11: ...low two operations The setting from the electronic board which is performed by positioning the J6 jumper see the Electrical Diagram on the two pines LPG module The J6 jumper is situated on a single pi...

Page 12: ...o the current standards The technical instructions should be studied before mounting installing starting or servicing It s forbbiden to install the boiler without earthing THE COUPLING FOR SCAVENGING...

Page 13: ...ostat may be installed on demand UTILIZATION INSTRUCTIONS The control board Display board LCD in the user module SW8 SW 7 SW2 Button Operation function This button shuts down opens out the boiler the...

Page 14: ...tting will decrease While visualizing the set point by the heating the symbol 7 is flickering DHW Pressing the button once the preset temperature of the DHW is displayed if you keep pressing the setti...

Page 15: ...ing Symbol 13 inermitent the conthrol system of boiler is achieving the mentain of temperature in the primary circuit as so at the request of DHW the time necessary for reaching the setted temperature...

Page 16: ...s irregularity disappears only pressing the button SW3 In case the limit thermostat LT is activated the system will shut down automatically and the intermittent symbol Err E8 occurs on the control pan...

Page 17: ...in case due to some disturbances the water temperature from the boiler will be below zero degree for more than 2 3 hours the boiler the heating installation and the domestic water installation will b...

Page 18: ...mmended temperature C 90 80 70 60 50 40 30 20 10 0 40 20 0 20 40 Outdoor temperature C Recommended temperature C T amb 30 C Ke 35 Ke 5 T amb 10 C The heating circuit temperature diagram depending on t...

Page 19: ...signed by the authorized person too who performs the putting into service who trained The person who performs the starting has the right of refusing the putting into service of the boiler if he estab...

Page 20: ...on and setting by the authorized personnel The yearly examinations are achieved on beneficiary demand and at the expense of the beneficiary the first year examination is compulsory to maintain the gua...

Page 21: ...ere is no flame Defective Defective Defective The component Temperature sensors The gas valve The heat exchanger Ignition ionization electrode Parasite spark Replace the ignition ionisation electrode...

Page 22: ...s lay out is through a below 0 C area and it froze there is air in installation E2 E2 The user calls the authorized service unit he belongs to The user calls the authorized service unit he belongs to...

Page 23: ...s boiler with forced draft MAXOPTIMUS C15SPV24MEFM THE Coupling 1 DHW inlet CH turn DHW gas supply cold water CH return 2 DHW outlet 3 Central heating turn 4 Central heating return 5 Gas supply 1 2 1...

Page 24: ...zation electrode 5 electrical pump with exhauster 6 burner 7 gas modulator 8 3 bar safety valve 9 filling valve 10 flowmeter for the sanitary circuit 11 automatic by pass 12 3 way valve 13 temperature...

Page 25: ...ings diagram for the wall hung gas boiler with forced draft OPTIMUS MT C15 SPV 24 MEFM Plan 3 25 1 2 700 65 51 64 65 A B C D E 3 4 3 4 3 4 1 2 1 2 415 226 189 Panta 3 aprox 2 134 75 280 Gaz Apa 125 15...

Page 26: ...ical flue system applications for the wall hung gas boiler with forced draft C15SPV24MEFM 26 C12 C12x C12 C12x C82 C32 C32x C42 C22 C22 COAXIAL FLUE TWIN FLUE Lmin 1m Lmax 3m Lmin 1m Lmax 5m Lmin 1m L...

Page 27: ...TR 2 EARTH FLAME ELECTRODE FAN JP 1 CH PROBE DHW PROBE EXT PROBE FLOWMETER RRESSURE TRANSDUCER MODULATOR COIL CRONO TERMOSTAT OPEN THERM 961 INTERFACE APS GND VCC GAS VALVE HALL SENSOR SAFETY THERMOS...

Reviews: