![Mosa GE 14000 SXC/GS Use And Maintenance Manual, Spare Parts Catalog Download Page 31](http://html1.mh-extra.com/html/mosa/ge-14000-sxc-gs/ge-14000-sxc-gs_use-and-maintenance-manual-spare-parts-catalog_1836885031.webp)
MAINTENANCE
GE
M
43.1
© MOSA
1.0-09/05
05/09/05 M43GB
!
ATTENTION
■
Maintenance operations on the electricity-generating group prearranged for automatic operation must be
carried out with the panel in RESET mode.
■
Maintenance operations on the installation’s electrical panels must be carried out in complete safety by cutting
off all external power sources: ELECTRICAL POWER, GROUP and BATTERY.
EVERY MONTH
AND/OR AFTER
INTERVENTION ON
LOAD
EVERY YEAR
1. TEST or AUTOMATIC TEST cycle to
keep the generating set constantly
operative
2. Check all levels: engine oil, fuel
level, battery electrolyte,, if
necessary top it up.
3.
Control of electrical connections and
cleaning of control panel
EVERY
WEEK
NO-LOAD
X
WITH LOAD
X
X
X
X
X
For the electricity-generating groups prearranged for automatic operation, in addition to carrying out all periodic
maintenance operations foreseen for normal usage, various operations must be carried out that are necessary in
relation to the specific type of use. The electricity-generating group in fact must be continuously prepared for
operation, even after prolonged periods of inactivity.
MAINTENANCE GENERATING SET WITH AUTOMATIC BOARD
☞
Carry out
motor oil change at least once a year, even if the requested number of hours has not been
attained.