Mosa DS-512400 User Manual Download Page 12

 

 

 

- 12 - 

3.

 

Project layout. Ensure the whole construction process of power equipment, batteries and 

other reasonable layout. 

4.

 

Wiring layout. Ensure that the wiring reasonable, orderly; and consider the moisture-proof, 

corrosion prevention. 

5.

 

The whole installation process should wear anti-static wristband. 

 

6.

 

The installation site should be at least two or more people to operate. 

 

 

CAUTION

Please ensure the installation site safe before installation. 

 

 

 

 

 

 

Step1. 

Connection Terminals and Interfaces Overview. 

1.

 

Connect to Inverter with power cable and communication cable. 

2.

 

More  than one battery module  to  parallel,  Set  the  ID  following  the  ID  arrangement 

table. Connect the power cable in  parallel  by  power cables and  connect communication 
cables  in  battery  comm  interface  with  communication  cables  . Connect the first  or  last  
battery module RS485/CAN interface to the PC monitor or SMPS or UPS controller. 
3.

 

Push the “ON/OFF” button to start the battery system. 

4.

 

Check the battery data and ensure the battery is on normal  operation. 

 

Caution 

 

If you have any questions about the installation, please stop and contact 

technical support immediately. If the battery does not start or control panel ALM lights, please 
disconnect the power line inspection and re-install the start, if still cannot solve please contact 
technical support, avoid damage to equipment or cause accidents. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for DS-512400

Page 1: ...LITHIUM ION BATTERY PRODUCT USER MANUAL DS 512400 DS 512460 INDUSTRIAL...

Page 2: ...1 REVISION RECORDS NO Revision Author Revision Of Content Revision Time 1 V1 0 First Release 07 24 2022 2 3 4 5...

Page 3: ...Panel features Introduce the interface function 4 Packing list Packing list 5 Installation Installation and operation 6 Shipping Storage and Disposal Shipping Storage Maintenance And Disposal BEFORE...

Page 4: ...the battery incorrect installation using the battery may cause personal injury or damage to the product 1 DO NOT throw the battery into water Store batteries in cool and dry environment when not in u...

Page 5: ...d or disassembled 9 Batteries are half charged before shipment Don t use the battery if it s hot bulge or smell abnormal and so on and report to after sale dept immediately 10 If you need storage the...

Page 6: ...urrent A 400 400 Dimension Weight Dimension L W H mm 750 460 320 750 460 320 Weight Kg 170 190 Communication Battery to Inverter RS485 CAN 2 0 Battery to Battery BMS RS485 Capacity Indicator 4LED 25 5...

Page 7: ...he BMS 3 ID Assign address of every model See Table 3 4 4 CAN CAN Communication interface 5 RESET 6 Battery Comm RS485 Battery inter comm when connect in parallel 7 Terminals Positive 8 Terminals Nega...

Page 8: ...face definition Pin No Definition Pin No Definition PIN 1 NC PIN 5 CAN CAN_L PIN 2 NC PIN 6 NC PIN 3 NC PIN 7 NC PIN 4 CAN CAN_H PIN 8 NC CAN_H CAN_L RS485 Communication interface definition Pin No De...

Page 9: ...8 4 PACKING LIST Parts List Item Item name Qty 1 DS 51200 R01 battery module 1 2 Power cable between battery and Inverter MPC 400A 600V 75mm _1m 2 3 Communication cable_1m 1 4 User manual 1 5 Carton 1...

Page 10: ...h the battery system is in good condition and free from defects 2 Before installation make sure that the power supply system is under shut down state while the battery system is also under shut down s...

Page 11: ...ete if any damaged please fill in the receipt 3 Please be careful while handling batteries avoid any damage Installation The battery is rack installed steps shows below CAUTIONS When begin to install...

Page 12: ...ry module to parallel Set the ID following the ID arrangement table Connect the power cable in parallel by power cables and connect communication cables in battery comm interface with communication ca...

Page 13: ...ree of alkaline acidic substances and other corrosive gases without a strong mechanical vibration shock and without strong electromagnetic field and direct sunlight Capacity was maintained at 50 to 60...

Reviews: