
- 12 -
3.
Project layout. Ensure the whole construction process of power equipment, batteries and
other reasonable layout.
4.
Wiring layout. Ensure that the wiring reasonable, orderly; and consider the moisture-proof,
corrosion prevention.
5.
The whole installation process should wear anti-static wristband.
6.
The installation site should be at least two or more people to operate.
CAUTION
:
Please ensure the installation site safe before installation.
Step1.
Connection Terminals and Interfaces Overview.
1.
Connect to Inverter with power cable and communication cable.
2.
More than one battery module to parallel, Set the ID following the ID arrangement
table. Connect the power cable in parallel by power cables and connect communication
cables in battery comm interface with communication cables . Connect the first or last
battery module RS485/CAN interface to the PC monitor or SMPS or UPS controller.
3.
Push the “ON/OFF” button to start the battery system.
4.
Check the battery data and ensure the battery is on normal operation.
Caution
:
If you have any questions about the installation, please stop and contact
technical support immediately. If the battery does not start or control panel ALM lights, please
disconnect the power line inspection and re-install the start, if still cannot solve please contact
technical support, avoid damage to equipment or cause accidents.