
- 10 -
5
I
NSTALLATION
Prepare to Install
The installation, operation and maintenance of DS-512400/DS-512460 lithium-ion phosphate
battery system must be performed by trained and qualified professional personnel. Before
installation and use, please carefully read the product safety precautions and related operating
rules. Strictly abide by the following safety rules and local safety regulations, otherwise may
cause personal injury or damage to the product.
1.
Make sure that the load equipment to be connected with the battery system is in good
condition and free from defects;
2.
Before installation, make sure that the power supply system is under shut down state,
while the battery system is also under shut down state;
3.
All the electricity cables must have corresponding grade of insulation, Please ensure that
no exposed cables;
4.
Make sure that the battery and power system are reliable grounding.
Installation environment
The requirement of installation environment is shown in table.
Type
Requirement
Working Temperature
Working Range
:
-20
℃
~+60
℃
Storage Temperature
-20
℃
~+60
℃
Relative Humidity
<
95%
Atmospheric Pressure
86kPa~106kPa
Site Requirements
No conductive dust and corrosive gas, no vibration. Keep away from
heat and flame