background image

The Specialist In Drum Handling Equipment

Model 410

Heavy-Duty Hydra-Lift, 72”, Manual Lift & Tilt

Operator’s Manual for Morse Heavy-Duty Hydra-Lift Karrier Model 410

Serial Number 1210 to ____ (MMYY)

morsedrum.com

Copyright 2022 - Morse Mfg. Co., Inc. 

 

Form OM410 (1210-____)  

 

(Updated 24 Mar, 2022)

 

5

CAUTION

 

– Do Not Transport with Drum Raised

ALWAYS LOWER THE DRUM HOLDER TO LOWEST POSITION BEFORE TRANSPORTING. 

 The 

unit can become unstable when transporting with a raised load.

5.) Lift drum to desired pouring height.  Operate tilt control as described in “Machine Description - Controls” to adjust drum 

attitude.  Floor lock should be engaged while dispensing / draining.

6.) When dispensing is complete, tilt drum back to upright position.  Disengage floor lock and lower drum to transporting height; 

about 6” (15 cm) off the floor.

WARNING

 - Stay Clear of Raised Drum

NEVER allow anyone to be below any part of a raised drum handler or drum.  Remain behind the 

push handle while handling a drum.

WARNING

 – Do NOT Disengage the Cinch Chain When Drum is off the Ground

When the drum is in the upright position, lower the drum to the floor before releasing the cinch 

chain.

7.) Push unit to drum storage area and lower drum to the floor in upright position.  Release cinch chain from ratchet by ap

-

plying pressure to ratchet handle in clockwise direction with one hand and opening pawl to free ratchet with other hand.  

Remove cinch chain link from the ratchet.

Operating Instructions

1.)  Push the Heavy-Duty Hydra-Lift Karrier to the drum.

2.)  Using “LIFT” control as described in “Machine 

Description - Controls”, position drum holder assembly 

with back band at middle of drum.  With ratchet plate 

swung open and cinch chain hanging from chain 

hook, push unit until back band rests firmly against 

drum.  Some adjustment to tilt angle of saddle may be 

necessary to ensure band fits flush on drum.  Engage 

floor lock.

3.) 

Attaching drum:

 Drape cinch chain across front of 

drum and engage chain link into notch in ratchet (Figure 

3.2).  Turn ratchet clockwise to tighten cinch chain.  If 

ratchet turns until pawl is beyond last ratchet tooth, turn 

ratchet back and slide next link into ratchet notch and 

try tightening again.  Cinch chain must be held tightly 

against drum with pawl engaged securely in ratchet 

teeth.

4.) Operate lift function to lift drum clear of floor.  Disengage 

floor lock.  Roll to dispensing location.  NOTE: Do not 

allow drum to impact on floor, pouring station, etc. or spill 

or damage could occur.

Figure 3.2

Summary of Contents for 410

Page 1: ...g the damage on the BILL OF LADING Document the damage and have the truck driver sign We recommend keeping a digital camera at your receiving dock for this purpose Open packages expeditiously to check the condition of the goods There is only a 24 hour window to notify the carrier of any concealed damage IMMEDIATELY REPORT ALL DAMAGE TO THE SHIPPING COMPANY Then you may contact Morse for assistance...

Page 2: ...peration only on clean level floors of suitable bearing capacity Do not use on sloped surfaces ramps irregular or debris strewn floors WARNING Do Not Modify the Unit Under no circumstances should any modifications be made to the Morse machinery without factory au thorization Any modifications may void the warranty This machine was designed to perform a specific job and alterations may result in in...

Page 3: ...anual tilt drum handler 55 30 Series Diameter Adapters for drum with diameter smaller than 22 56 cm To handle a smaller drum insert the correct size Diameter Adapter into the standard drum holder See Diameter Adapter info at https morsedrum com products diameter adapters ONLY Diameter Adapters for drum with 17 5 44 5 cm diameter or smaller have integrated brackets to prevent drum slipping length w...

Page 4: ...um to angle required for pouring The drum handler is equipped with the MORStop Tilt Brake there is no need to hold tension on both sides of the chain loop Braking is immediate and self actuating without additional steps by the operator Figure 2 3 IMPORTANT START UP Procedure Machine is shipped with hydraulic fluid BEFORE operation REMOVE the RED shipping plug from the hydraulic reservoir REPLACE w...

Page 5: ...ch chain 7 Push unit to drum storage area and lower drum to the floor in upright position Release cinch chain from ratchet by ap plying pressure to ratchet handle in clockwise direction with one hand and opening pawl to free ratchet with other hand Remove cinch chain link from the ratchet Operating Instructions 1 Push the Heavy Duty Hydra Lift Karrier to the drum 2 Using LIFT control as described ...

Page 6: ... to prevent failure and maintain proper function Inspect the hydraulic system for oil drips hose damage or other signs of wear Inspect the level and condition of the hydraulic fluid Replace any parts that show signs of wear Grease wheel bearings periodically Oil or grease all moving parts including the clevis pins and the surfaces of the boom which contact the inside of the mast cap the gears and ...

Reviews: