Operation
5-8
August 2014
C2 Contour Air Drill
Opener Operation
Accumulator System Operation and Pre-Charge Information
• Always turn “Operating” valve out to bleed off/service
position and relieve hydraulic pressure from the
system before performing maintenance or repairs.
Note: Accumulator can store pressure even when
disconnected from tractor.
• The gas bladder in the hydraulic accumulator should
be pre-charged with dry nitrogen gas before being
mounted on the unit.
• Different accumulator pre-charge pressures will allow
for different ranges of trip out force, as shown in the
chart.
• Pre-charge pressure should be set for the most
common working conditions.
• Lower pre-charge pressures with higher operating
pressures will give longer lifting and lowering times.
HIGH-PRESSURE FLUID HAZARD
To prevent serious injury or death:
• Relieve pressure on hydraulic system before
servicing or disconnecting hoses.
• Wear proper hand and eye protection when
searching for leaks. Use wood or cardboard
instead of hands.
• Keep all components in good repair.
Warning
ACCUMULATOR
OPERATING
VALVE
PRESSURE
ADJUSTMENT
Accumulator Operating Range
Nitrogen
Pre-charge
Pressure
Display Pressure
Minimum
Maximum
350 psi (2413 kPa)
450 psi (3102 kPa)
1200 psi (8274 kPa)
* Maximum system hydraulic pressure is 1200 psi or 4 times the pre-charge
pressure, whichever is the lower number.
Summary of Contents for C2 Contour
Page 1: ...OPERATOR S MANUAL S50150 02 C2 Contour Air Drill...
Page 2: ......
Page 19: ...Safety C2 Contour Air Drill August 2014 1 15 Lighting and Marking Continued...
Page 20: ...Safety 1 16 August 2014 C2 Contour Air Drill Lighting and Marking Continued...
Page 28: ...Checklist 3 4 August 2014 C2 Contour Air Drill Notes...
Page 56: ...Operation 5 26 August 2014 C2 Contour Air Drill Notes...
Page 82: ...Maintenance 6 26 August 2014 C2 Contour Air Drill Notes...
Page 86: ...Storage 7 4 August 2014 C2 Contour Air Drill Notes...
Page 91: ......