____________________________________________________________________
_______________________________________________________________________
MN0090-05 Page 37 of 68 18008
MPT-90 PRODUCT MANUAL
This document contains U.S. export controlled technical data as regulated by the U.S. Export Administration Regulations 15 CFR Parts 730-774, export, disclosure or transfer contrary to U.S. law is prohibited.
4.3.3
MPT-90 Installation
The Mounting Base (6.0” diameter) is drilled with six (6) .39” diameter
mounting holes on a 5.0” diameter bolt circle. Using the mounting holes,
fasten the base to a stable platform using (recommended
) 5/16” high strength
stainless steel bolts, washers, and nuts. Refer to Figure 12.
NOTE
Consideration of wind and ice load factors on the Pan & Tilt Unit, and its
payload, are important when calculating how solid the mounting platform
has to be and the strength required by the mounting bolts.
Figure 12: Mounting Base
1. Place the MPT-90 on the mounting surface. Align the base connector with
the back of the mounting surface and make sure that the pan and tilt is
pointing in the correct direction.
2.
Using an alternating pattern insert six (6) 5/16” high strength stainless steel
bolts through the MPT-90 mounting base and mounting surface.
3. Install six (6) washers and nuts on the bolts
4. Torque the nuts to 18-23 ft. lbs.