9 Start-up
Preparations
© Moog GmbH User Manual "D633-A Series" (CA80942-001; Version 1.0, 12/08) 47
9.1 Preparations
Preparations for start-up
The valves may only be started up when the following is ensured:
• The higher-level machine with all of its installed components complies
with the latest versions of the relevant national and international regula-
tions, standards and guidelines (such as e.g., the EU Machinery Directive,
the regulations of the trade association and of TÜV or VDE).
• The valves and all of the other installed components are in a technically
fault-free and operationally reliable state.
• No signals which can lead to uncontrolled movements in the machine are
transmitted to the valves.
Chapter "2.1 Intended operation", page 5
9.2 Start-up of the valves
Procedure for start-up
Procedure:
1.
Make sure that all of the machine components, connections and ports
conform to the specifications of the machine manufacturer and operator.
2.
Prepare the hydraulic system.
Chapter "9.3 Filling and flushing the hydraulic system", page 48
3.
Establish the valve hydraulic connection.
Chapter "7.3 Mounting the valves", page 38
4.
Establish the valve electrical connection.
Chapter "8 Electrical Connection", page 41
5.
Make sure that all of the mechanical, electrical and hydraulic connections
are correctly established.
6.
Start-up of the hydraulic system.