Page 14
PL52DF* Indoor Gas Fireplace
XG0218 - 160215
Installation
Figure 11. 5"/8" Top
Vent Venting Graph for wall mounted
terminations
.
84”
96”
A
C
B
Unacceptable vent run
within shaded area.
Acceptable vent run
within non-shaded area.
If your installation does not fall
within the venting graph parame-
ters, please contact a local Montigo
Dealer for Power Venting options.
The Venting Graph:
Measure the vertical height from the fireplace hearth to the
centre of the termination and the horizontal run from the
fireplace flue collar to the wall flange of the termination. Plot
on the Venting Graph
Figure 11
with an 'X'.
If the 'X' falls on or above the top boundary of the shaded
area, the installation is acceptable.
Example A: (Acceptable Installation)
If the vertical dimension from the hearth is 120" and the
horizontal run to the wall flange of the vent termination
is 120", this would be an acceptable installation.
Example B: (Unacceptable Installation)
If the vertical dimension from the hearth is 36" and the
horizontal run to the wall flange of the vent termination
is 84",
this would not be an acceptable installation.
Example C: (Unacceptable Installation)
If the vertical dimension from the floor of the fireplace is
60" and the horizontal run to the wall flange of the vent
termination is 144",
this would not be an acceptable
installation
.
Figure 11a. 5"/8"
Top Vented, wall mounted installation with one
90° bend. The vent run must comply with Venting Graph for Top
vent, wall mounted terminations,
Figure 11
.
Wall mounted Terminations
The following details are some possible configurations for
Wall mounted terminations.
Heat Shiel
d
Te
rmination
Hearth
Exterior
Wall
Flex section
7’ Max. for min Vertical
8’ Min.
Note:
Images are shown without screens for clarity
purposes. However, your fireplace should not be operated
without proper installation of screens.
Section 3-3-2: Venting Layout
Wall mounted termination.
Selection of components and details of venting layout
should adhere to the following guidelines:
Vent terminations must not be recessed in walls or
siding.
For Heat Shield requirements see
Section 3-5
.
Once the proposed venting layout has been
determined refer to
Figure 11 or 12
to ensure the
layout is acceptable.
Notes Wall Mounted Terminations: 5"/8" TOP VENT
All measurements for vertical or horizontal runs are
measured from center of the vent pipe.
Venting runs
must
fall within the limits set by the
venting graph, see
Figure 11