background image

Page 6 

 

Step 7: Installing the cover panels 

 
Install the base cover panels as the last step of your installation.  The pegs should align with the white insert 
holes on the cast base.  Apply enough pressure so that the peg fits fully into the insert.   
 

Using your new HS1 Wakeboard Tower 

 Operating Instructions 

The HS1 tower easily folds for storage.  To fold the tower, remove the quick release knobs and slowly guide the tower to 
the folded position.

  

 

When the tower is folded, always use a vest or other cushion to protect your 
boat where the tower and boat touch. 
 

IMPORTANT

 

 The tower cannot be towed when folded.  The tower must be 

in the upright position when being towed. 
 
After towing and before every use, please check and tighten bolts and nuts 
when necessary. 
 
The HS1 tower is silent by design. If you hear any rattling or noise from the 
tower, or see any movement in the tower, stop and check all hardware for 
tightness.  Call us at 877-778-6937 if this does not correct the problem.  
 

  Always understand and follow the warnings on the tower label! 

Summary of Contents for HS1

Page 1: ... can exceed 10 G on double ups Towing forces are transferred into the deck of the boat Monster Tower REQUIRES reinforcement to be installed under the deck by a qualified installer who can take your boat s individual mounting situation into account Every boat mounting location and configuration is unique and needs to be assessed by a fiberglass professional to ensure the forces generated from towin...

Page 2: ...Page 2 Step 1 To ensure you are not missing any hardware layout all pieces and verify you are not missing any hardware Supplied pieces Tools Needed ...

Page 3: ... holes for each base Be sure to drill in reverse to get through the gel coat this will prevent spider cracks from forming Once you are through the gel coat you can drill normally Determine which side of the boat the navigation light needs to run to and drill the 13 16 hole according to the template Step 3 Base Installation Remove the paper templates and place the correct rubber gasket over the mou...

Page 4: ...nylon washer pc 3 brass nut pc 4 quick release knob assembly pc 5 and set screw pc 14 identical to the installation on the starboard side Step 5 Aligning the Top Section Now that everything is installed align the top section so the holes for the locking bolts pc 12 can be drilled Using an X pattern measure from the edge of the top section to a reference on the opposite side cast base Use the same ...

Page 5: ... the wire through the tower to the side of the boat you drilled for the navigation light At the end of the leg pull out the wire and run it into the wire slot of the leg mounting plate In most cases the LED anchor light can be wired into the existing navigation light system ...

Page 6: ...er to the folded position When the tower is folded always use a vest or other cushion to protect your boat where the tower and boat touch IMPORTANT The tower cannot be towed when folded The tower must be in the upright position when being towed After towing and before every use please check and tighten bolts and nuts when necessary The HS1 tower is silent by design If you hear any rattling or nois...

Reviews: