4
INSTALLATION
1.
Place the Base (B) on a desk or table.
2.
Insert the Pole Assembly (C) into the hole in the base,
then turn it clockwise to tighten the connection.
3.
Place the Arm Assembly (A) onto the Pole Assembly
(C), adjust the height as desired, then use the 4mm
Hex Wrench (G) to tighten the screw as shown in the
following figure to the right. You can also adjust the
height by loosening the lock collar and extending the
pole assembly up or down as desired.
4.
Place a towel or blanket on a table or on the floor, then place one of your monitors
face down on the towel/blanket.
5.
Insert two (2) Short M4x12 Screws (E) or Long M4x12 Screws (F) into the upper two
VESA® mounting holes. Tighten them to the point where there is 2-4mm between
the back of the monitor and the screw head. If necessary, use the ø8.0 x ø5.5 x 5.0
mm Bushings (D) to reduce the space between the screw heads and the back of the
monitor.