background image

I-00235            Rev B

R4CN Series

Four Post Open Frame Rack

Instruction Sheet

THANK YOU

Thank you for purchasing the R4CN Series Open Frame Rack. Please read these instructions 

thoroughly before installing/assembling this product.

PRODUCT FEATURES

- Four post design provides unrestricted heat flow and access to equipment

- Four-point mounting for deeper, heavier components

- Use with optional VCD Series Vertical Cable Duct for clean, reliable cable management 

- Cage nut rackrail ideal for mounting most servers

- Optional Side Panels and Additional Rail Kits available

WEIGHT RATING

- 800 lbs. UL listed load capacity

UL

R

C              US  

    LISTED

Summary of Contents for R4CN Series

Page 1: ...g this product PRODUCT FEATURES Four post design provides unrestricted heat flow and access to equipment Four point mounting for deeper heavier components Use with optional VCD Series Vertical Cable Duct for clean reliable cable management Cage nut rackrail ideal for mounting most servers Optional Side Panels and Additional Rail Kits available WEIGHT RATING 800 lbs UL listed load capacity UL R C U...

Page 2: ...Page 2 PARTS CHANNEL QTY 4 A PART TOP BRACKET QTY 2 B PART CENTER BRACKET QTY 2 C PART BOTTOM BRACKET QTY 2 D PART BASE QTY 2 E PART FRONT BRACKET QTY 2 F PART 2 Left Channels 2 Right Channels ...

Page 3: ...Y 25 PART G QTY 100 CN6MM 100 6MM CAGE NUTS FOR EQUIPMENT INSTALLATION QTY 100 FOR EQUIPMENT INSTALLATION ADDITIONAL RAIL HARDWARE KIT PART ARRHK Z RAIL ADAPTOR QTY 4 PART 1 4 20 BOLT QTY K J PART 16 OVAL NUT QTY L PART 16 SQUARING PANEL QTY 2 PART N CAGE NUT RACKRAIL QTY 4 PART Z RAIL ADAPTER CAGE NUT RACKRAIL PARTS M 12 ...

Page 4: ... FIGURE E 4 Repeat steps 1 3 to install a second Channel A 5 Fully tighten screws in all locations 6 Repeat steps 1 5 for the second side assembly NOTES Bottom of Channels indicated by two mounting holes Top of Channels indicated by one mounting hole FIGURE A When installing brackets see FIGURE B for teardrop orientation Tools Required For These Steps 2 Phillips Driver FIGURE E FIGURE A SEE FIGURE...

Page 5: ...and Bases E with supplied hardware H as shown Loosely tighten hardware SEE FIGURE F SEE FIGURE G 2 Stand rack upright square the assembly by installing the squaring panels N with supplied 6MM cage nuts and rack screws as shown Fully tighten all hardware FIGURE H F E FIGURE F FIGURE H Tools Required In This Step 9 16 Wrench H H FIGURE G N N ...

Page 6: ...as shown Loosely tighten hardware ASSEMBLY TOP AND BOTTOM FACING INWARD SEE FIGURE J SEE FIGURE K FIGURE L FIGURE K FIGURE J F H H A E 2 Stand rack upright square the assembly by installing the squaring panels N with supplied 6MM cage nuts and rack screws as shown Fully tighten all hardware FIGURE L Tools Required In This Step 9 16 Wrench N N ...

Page 7: ...ths Tools Required 7 16 wrench 1 Install Z Rail Adaptor as shown in desired locations SEE FIGURE M M M NOTE Cage Nut Rackrail for 45 space rack comes in two sizes Pair like sizes accordingly TIP Depending on mounting needs Cage Nut Rackrail can be mounted at different depths CAGE NUT RAIL INSTALLATION Tools Required 7 16 wrench 1 Install Cage Nut Rail as shown in desired locations FIGURE N SEE FIG...

Page 8: ...F ANY KIND EITHER EXPRESSED OR IMPLIED INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW IN NO EVENT SHALL THE COMPANY BE LIABLE FOR ANY SPECIAL INCIDENTAL INDIRECT OR CONSEQUENTIAL DAMAGES WHATSOEVER INCLUDING WITHOUT LIMITATION DAMAGES FOR LOSS OF BUSINESS PROFITS BUSINESS INTERRUPTION OR ANY ...

Reviews: