
17
STEP 10 CONNECT WATER SUPPLY
• Locate and bring tubing to the front of the cabinet.
• Turn the water on to flush debris from line. Run about
a quart of water through tubing into a bucket, then
shut off water.
Copper Tubing:
• Slip a 1/4
”
QXWDQGIHUUXOHSURYLGHGRYHUERWKHQGV
of the copper tubing. Insert tube into the union fitting
on the unit and tighten nut to union.
• Turn on the water to check for leaks.
GE SmartConnect
™
Tubing:
• Insert the molded end of the tubing into the
refrigerator connection. Tighten the compression nut
until it is just hand tight.
• Tighten one additional turn with a wrench.
Overtightening can cause leaks!
• Turn on the water to check for leaks.
Note: Make sure excess tubing length does not
interfere with drawer closing or toekick installation.
STEP 11 CONNECT POWER
• Check to be sure the power cord is plugged into the
receptacle.
• Check to make sure power to refrigerator is on
by opening refrigerator door to see if interior lights
are on.
7KHWHPSHUDWXUHFRQWUROVDUHSUHVHWDW)
IRUWKHIUHVKIRRGVHFWLRQDQG)IRUWKHIUHH]HU
• Allow 24 hours to stabilize before making
adjustments.
STEP 12 START ICEMAKER
)OLSWKHVZLWFKWR,217KHLFHPDNHUZLOOEHJLQ
operation automatically.
• Be sure nothing interferes with the sweep of
the feeler arm.
• Discard the first full bucket of ice cubes.
7RWXUQWKHLFHPDNHURIIVHWWKHVZLWFKWR22))
ON
OFF
Refrigerator
Water Supply
House
Water Supply
Installation Instructions
Summary of Contents for 224D3735P001
Page 19: ...19 Notes ...