38
74D0009
Figure 52 - Junction Box Wiring Diagram
FP1912
Junction box wiring
8/08
Junction Box
Factory Supplied
Not Supplied
10V AC
60Hz
OPTIONAL FAN/BLOWER SYSTEM (BLOTBCDVSC)
Installation Instructions
Wiring
1. Before installing the blower, wire the receptacle into an electri-
cal circuit. This should be done before framing the fireplace.
Wire with minimum 60° C wire in accordance with prevailing
codes.
2. Remove the external junction box cover by removing the screw
from the left side of the outside firebox wall. Junction box was
installed at the factory.
3. The junction box cover has a factory installed “romex” style
strain relief connector. After connecting the wires, route the wire
leads through this connector. Refer to the wiring diagram in
Fig-
ure 52
.
Before Installing the Blower
1. Always turn off the gas supply and allow the unit to cool down before pro-
ceeding.
2. Clean the inside of the firebox (wall and floor), where the blower and wires
will be installed. Make sure the firebox wall and floor are clean and dry be-
fore mounting the blower.
Installing the Blower
1. Remove the lower access panel by pulling up and away from unit.
2. Remove glass frame by releasing the two (2) latches (500 model has three
(3) latches) below the firebox opening and lifting glass frame up and away
from unit.
3. Remove logs.
KT503
blower magnets
11/08
Magnet
KT503
Figure 54 -
Magnet Installation
4. Remove grate from engine by
lifting up.
5. Remove hearth brick and wall
brick panels.
6. Disconnect the gas line to the valve.
7. Remove screws securing engine base to firebox floor and lift engine up to
remove.
8. Two (2) magnetic strips have been supplied to secure each blower to the
firebox floor. Place on bottom of each blower before installing.
Figure 54
9. The blowers are to be inserted flat through the engine cutout in the firebox
floor. Slide each blower over to the sidewall location.
Figure 55
OPTIONAL FAN BLOWER SYSTEM
10. Turn blowers with discharge vent facing up. Slide the discharge vent so that it is facing up. Slip
discharge vent flange under the flange bracket flush against the sidewall. Slide blower side tabs
over into side flange.
Figure 56.
The blower is now locked in place.
11. Remove control box from engine assembly by cutting the wire ties. Lift the metal bracket up and
slide forward.
10. Align the connector pin on the AC box to the control box and gently push them together using the
guiding block as a guide.
Figure 57
12. Secure the AC box to the control box using screw provided.
13. Connect the blower according to the wiring diagram.
Figure 58
14. Replace engine, brick, grate, logs and door in reverse order of removal.
FP1918
blower location
9/08
Figure 53 -
Blower Location
FP1918
Summary of Contents for Direct Vent BLDV400
Page 54: ...54 74D0009 2 3 4 5 6 7 illustrated parts lists firebox components ...
Page 65: ...74D0009 65 ...
Page 66: ...66 74D0009 ...