0112-0126 B
13
Chapter 2: Setting Up the Instrument
Before you unpack and set up the instrument, prepare a dry, flat work area that has
sufficient space for the instrument, host computer, and required cables. To provide access
for disconnecting power from the instrument, maintain a 20 cm to 30 cm (7.9 in. to 11.8 in.)
gap between the rear of the instrument and the wall. To ensure sufficient ventilation, do not
block the ventilation grid on the right side of the instrument.
WARNING!
Potential lifting hazard. To prevent injury, use a minimum of two
people to lift the instrument.
The package contains the instrument and accessories to set up the instrument:
SoftMax Pro Software, product key, and installation guide
Instrument Installation Guide
USB computer connection cable
AC power adapter
Parallel printer connection cable
For a complete list of the package contents, see the enclosed packing list.
The packaging is designed to protect the instrument during shipment. Tape is placed on the
cuvette door and the plate drawer to protect the instrument from damage during shipment.
CAUTION!
Do not touch or loosen screws or parts other than those specifically
designated in the instructions. Doing so could cause misalignment and possibly void
the warranty.
Note:
Retain the shipping box and all packing materials for future transport needs.
CAUTION!
When transporting the instrument, warranty claims are void if damage
during transport is caused by improper packaging.
To unpack the instrument:
1. Check the box for damage that occurred during transportation. Inform the supplier
immediately and keep the damaged packaging.
2. Open the top of the box.
3. Lift the accessories tool box and the instrument from the package and place the
instrument on a level surface.
4. Remove the packing material from both ends of the instrument and set the instrument
down carefully.
2