2. Loosen the four M16 clamping bolts until a small gap is visible between
the lockring and the rotating plate at approximately 0.1 to 0.3 mm (0.004
to 0.01 in.).
1
2
1. Front - barrel end
2. Lockring
Figure 11-10 Gap between the rotating plate and lockring
3. Release the rotary stopper - a white band will show on the plunger when
released. Rotate the E-Multi Radial to the approximate angle required.
NOTE
The rotary stopper can be depressed to prevent further rotation. It can be
depressed in rotational increments of 15°. It may not depress at the exact
rotation position required for final nozzle concentricity.
Plunger
4. Loosen the X-Axis brake. Use the handles to position the E-Multi Radial
to the correct X-Axis position. Tighten the X-Axis brake.
5. Clean all plastic and debris from the nozzle tip and hot runner inlet
contact surfaces. Use a wire brush or similar tool.
6. With the controller in Setup mode, move the E-Multi downwards
(forwards) until the nozzle is approximately 10 mm (0.4 in.) away from
the hot runner inlet. If necessary, manually adjust the E-Multi Radial to
improve the rough nozzle alignment.
NOTE
The rotary stopper may need to be released.
Manual Position Adjustment - continued
11-11
E-MULTI RADIAL OPTION
E-Multi User Manual
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.