26
TM SmartCool One 5057724 v1.0_08_2022
Check the unit is as ordered. Discrepancies or transit damage should be reported to Airedale
immediately.
Airedale will accept no responsibility for mishandling during the positioning of the equipment.
IMPORTANT
When using a forklift to position the unit, the forks must pass through the slots as shown. Forks must not exceed the
depth of the unit to ensure the forks do not clash against the rear gland plate when against a wall. When not against
a wall, all gland plates can be removed so the above does not apply.
Gland plates can be applied once forks are removed.
5. The unit and floor stand shall be fastened together using M6 fixings, this is most important in seismic applications.
6. The metal body of the floor stand should be bonded back to the main unit ground by means of a ground wire and
lug connection local to the floor stand gland plate. This is specific to the 60Hz units only.
7. Check that external panel fixings are tightened to a torque of 1Nm.
8. Torque settings for ATS, isolator and MCBs are:
-0 and -A Supply Units
ATS = 5Nm
SO09 to SO40 Isolator = 3.5Nm min to 3.85Nm max
SO50 and SO60 Isolator = 4Nm min to 4.4Nm max
MCB = 2Nm
-3 Supply Units
Please contact Airedale for details.
Check and re-tighten all electrical connections on the unit after several hours of operation.
SmartCool™
Precision Air Conditioning
Ins
ta
lla
tio
n