background image

2

75-511.13

 Model

 Type 

Model Size

 PAE/BAE

 

30  50  75  100 125 145  –  175  200 225  –  250  300 350 400

 

Suffix

 -1  -2 

*

-14 -4 -5 -6 – -7  -8 -9 – -10 -11 -12 

-13

 

PV/BV

  30  50  75  100  125 145  –  175  200  – 

–  250  300  350 400

 

Suffix

 

-1 -2 -14 -4 -5 -6 – -7  -8 –  – -10 -11 -12 

-13

 

DJE/DHE

 –  –  75  100 125  –  150  –  200 225  –  250  300 350 400

 

Suffix

 –  –  -14 -15 -16 –  -6  –  -8  -17  –  -10  -11 -18 -13

Selection of the Proper Kit

Table 2.2

Natural Gas to Propane Gas Conversion Kit Selection Guide  

(For units manufactured after April 1, 1991)

Base Kit Number – 3H33749…(Choose correct suffix -1, -2, -3 etc., per instructions, before ordering propane conversion kits.)

Table 2.1

Natural Gas to Propane Gas Conversion Kit Selection Guide 

Base Kit Number – 3H034670…(Choose correct suffix -1, -2, -3, etc…)

Table 2.3

Natural Gas to Propane Gas Conversion Kit Selection Guide

Base Kit Number – 3H036483…(Choose correct suffix -1, -2, -3 etc...)

*

  For units manufactured after September, 1993. For units manufactured prior to this date, consult the factory.

  Model Type    

 

 

 

 

 

 

 

Model Size

    

DFG/IFG/NFG, DFP/IFP, DFS/IFS 

75  100  125  150 175 200  225 250  300 350  400

  

Suffix

       

-1 -2 -3 -4 -5 -6  -7 -8 -9 -10 -11

Figure 2.1 

Typical Serial Plate

Modine Manufacturing Company

1221 Magnolia Ave., Buena Vista, VA  24416; Phone: 540-261-2166

PD  250AA0111 

 

115 

5.7 

60

30011013601-0978 

6.0 

ANS Z83.8 - 96

Natural 

3.5 CGA-2.6-M96

 

0.0 

MEA 293-96-E

j

l

k

 Model

 Type 

Model Size

 PD/BD, 

 PDP/BDP

 

30  50  75  100 125 150 175 200 250 300 350 400

 

Suffix

 

-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12

NATURAL TO PROPANE CONVERSION KIT SELECTION GUIDE

Referring to the model number box on the serial plate in Figure 

2.1 (above), the prefix letters and succeeding numbers which are 

needed for kit selection are PD250.
The letters identify the model, and the numbers indicate the size 

of the unit. Referring to Tables 2.1, 2.2, or 2.3 locate the model 

type column (i.e. PD, BD, etc.). Working with Table 2.1 and the 

row labeled PD/BD, move right searching for the proper model 

size. Read the kit number suffix directly below the model size 

for a PD250. Add this suffix (-9) to the base part number for the 

propane conversion kit shown in the heading of Table 2.1. The 

correct kit for a PD250 with Control Code 11, is 3H034670-9.

Summary of Contents for PD/BD

Page 1: ... model number are N1 or S1 This is item 2 in Figure 2 1 Any other number code disqualifies the unit for conversion 3 Item 3 in Figure 2 1 in the serial number box designates the date the unit was built In Figure 2 1 the numbers 3601 are shown This number is interpreted as the thirty sixth week of 2001 Prior to January 1995 the digits preceding the year represent month of manufacture After January ...

Page 2: ...NFG DFP IFP DFS IFS 75 100 125 150 175 200 225 250 300 350 400 Suffix 1 2 3 4 5 6 7 8 9 10 11 Figure 2 1 Typical Serial Plate Modine Manufacturing Company 1221 Magnolia Ave Buena Vista VA 24416 Phone 540 261 2166 PD 250AA0111 115 5 7 1 60 30011013601 0978 6 0 I ANS Z83 8 96 Natural 3 5 CGA 2 6 M96 0 0 MEA 293 96 E j l k Model Type Model Size PD BD PDP BDP 30 50 75 100 125 150 175 200 250 300 350 4...

Page 3: ... After removing burner assembly proceed with step 4 page 4 For Indoor Duct Furnace Models On DHE IHE models lower the controls enclosure cover and disconnect the pilot gas supply line and thermocouple at the gas valve On models DJE IJE DFG IFG NFG DFP IFP DBG IBG DCG ICG DBP IBP and DCP ICP models the gas controls are exposed On models DFS IFS remove lower assess door to expose gas controls and bu...

Page 4: ...the pilot orifice stamped BCR 18 with the pilot orifice supplied in the conversion kit stamped BBR 11 or 12 For PSE pilots replace the pilot orifice stamped 018N with the pilot orifice supplied in the conversion kit stamped 012LP 5 Verify that pilot is oriented to main burner as shown in Fig 4 3 6 Exchange main burner orifice s and install air shutters see Figure 4 4 Check the orifice number stamp...

Page 5: ...4751B 52 45 49 45 42 45 43 40 43 42 43 39 40 37 45 48 37 43 Drill Size Qty 1 1 2 2 2 3 3 3 4 4 5 5 6 1 2 3 3 6 Carton Label 1 5H73133C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Description Qty Part Number Honeywell Pilot Orifice 1 Orifice Stamp BBR 11 Parts Common To Kits Robertshaw Pilot Orifice 1 Orifice Stamp 10 LP Table 5 1 and Table 5 2 PSE Pilot Orifice 1 Orifice Stamp 012 LP Air Shutter ...

Page 6: ... outlet pressure should be 10 in w c The outlet pressure can be adjusted at the combination gas control s regulator Turning the adjustment clockwise will increase the outlet pressure while turning it counterclockwise will decrease the pressure 18 Verify normal operating sequence of ignition system according to the Installation Service Manual 19 Check for leaks at all joints and connections in the ...

Page 7: ...or the unit heater s rated input The input can be verified at any time simply by checking for the correct main burner orifice size and manifold pressure This information is presented on the conversion kit rating plate EQUIPPED FOR USE WITH PROPANE GAS NTRL 5H604841A INSTALLATION ...

Page 8: ...HVAC Products Modine Manufacturing Company 1500 DeKoven Avenue Racine Wisconsin 53403 2552 I O Model Series Phone 1 866 823 1631 Toll Free All Other Model Series Phone 1 800 828 4328 HEAT Modine Manufacturing Company 2016 ...

Reviews: