Manuale di Installazione e Service
i-class
Pag. 39 / 64
Fitting and Service Handbook
27/02/2018
REV
01
Mobility Networks
12 Estuary View Business Park, Whitstable, Kent, CT5 3SE, UK
Tel: +44 (0)1227 505022 Fax: +44 (0)1227 505023 www.mobilitynetworksgroup.com
Mobility Networks is a trading name of Mobility Networks (Holdings) Ltd. Registered in England & Wales number 08295602
9.3. Verifica dei perni e delle boccole / Pins and bushings
Verifica /
Verification
Intervento /
Intervention
Tempo richiesto
Time required
15’
120’
Personale necessario
Personnel required
1
1
Strumenti
Equipment
Nessuno
None
Paranco e attrezzi da banco
Hoist and tool kit
Materiale
Materials
Nessuno
None
Ricambi
Spare parts
Descrizione
Description
Eseguire n°2 cicli completi di apertura,
discesa, salita, chiusura e verificare
visivamente l’assenza di giochi tra perni
e boccole delle articolazioni.
Carry out n°2 complete cycles of
deploying, lowering, lifting and stowing
and check there are no clearances
between pins and bushings of the
articulations.
Rimuovere il sollevatore dal veicolo
(seguire a ritroso le istruzioni riportate al
Cap.
5
) e sostituire le boccole con
materiale di ricambio.
Remove the lift from the vehicle (carefully
follow backward the instructions in
Chapter.
5
) and replace the bushings.
NOTE