
System Installation
MA 1000 Installation and Configuration Guide
25
4.3.2.1 Assembly
and
Connections
Refer to Figure 19.
ATTENTION
To prevent damaging the SMA connectors,
be sure to tighten using a torque of 8lb.
1. Position the supplied bracket on the 1000 RHU and secure the
bracket
to the
1000 RHU
using the four supplied
6-32 NC
screws.
2. Position the RHU Add-on unit on the bracket and secure the
Add-on
to the
bracket
using
the four supplied
8-32
screws.
3.
Interconnect
the 1000 RHU and RHU Add-on SMA
Uplink
,
Downlink
and
High
connectors on the rear panels of both units using the
three
straight
jumpers.
4.
Interconnect
the 1000 RHU and RHU Add-on
D-type 9-pin
connectors on the rear panels
of both units using the supplied flat-cable.
5. Connect the power to the RHU Add-on front-panel
DC
connector.6.
Figure 19. RHU Add-on to 1000 RHU Assembly