
System Installation
MA 1000 Installation and Configuration Guide
21
4.2.5 RIU
Connections
Refer to the RIU Products Installation and Configuration Guide for detailed instructions on
connecting the RIU model in your installation.
4.2.6 BU
Connections
NOTE:
It is assumed that the patch panel cabinet (SC/APC adaptors) for fiber optic cable
connections is installed in the rack near the BUs.
1. Connect (3/125/900) pigtail with SC/APC connectors between
splice tray
and
patch panel
cabinet.
2. Connect (3/125/3000) SC/APC jumpers between the corresponding
BU
and
patch panel
.
3. Connect the fiber optic cables from the
BU
to the
RHUs
through the patch panel cabinet.
4. Connect the
UL RF
Output and
DL RF
Input connectors to the RIU or UL and DL connectors
or to the passive interface (such as Interface Box) in topologies that do not include RIUs.
4.2.7 Controller
Connections
Refer to the MobileAccess
NMS 410/430 or SC-450 Installation and Configuration Guide for
connections.