© MOBATIME
TE-800640.03
Installation instructions
PROFILINE – industrial clocks, double-sided, square
Before installation of the clock please read the manual carefully.
References to the Instruction Manual
1. The information in this Instruction Manual can be changed at any time without previous
notice.
2. This Instruction Manual has been composed with utmost care, in order to explain all details in
respect of the operation of the product. Should you, nevertheless, have questions or discover
errors in this Manual, please contact us.
3. We do not answer for direct or indirect damages, which could occur, when using this Manual
4. Please read the instructions carefully and start the setting-up of the product, only once you
have correctly understood all information for the installation and of the operation.
5. The installation must only be carried out by skilled staff.
6.
It is prohibited to reproduce, to store in a computer system or to transfer this publication in a way or
another, even part of it. The copyright remains with all the rights with BÜRK MOBATIME GmbH,
D-78026 VS-Schwenningen and MOSER-BAER AG – CH 3454 Sumiswald / SWITZERLAND.