© MOBATIME
13 / 20
800640.03
Cascade:
OU
T
IN
OU
T
IN
OU
T
IN
OU
T
IN
OU
T
IN
Cascading means that a number of movements will be connected in
series.
Up to three slave movements BU 192 can be connected to one
master movement.
As master movement the following type can be used:
FU
192
QU
192
BU 192 mit serieller Synchronisation (with IF 494)
The cascading is done by means of a cascade cable COM 192
(length 1m), enabling to synchronize 4 movements with only one
reference signal. After starting-up the time synchronization for all
movements will follow in a few seconds only. Should the time for the
master movement change during the normal operation, the time
take-over for each connected movement will take about 2 minutes,
which means totally about 8 minutes. This is also valid for the
daylight saving time change.