background image

 

 

 

  ©Newport Corporation  

MKS Spectra-Physics Confidential  

6

 of 

10

 

 

General Specifications 

 

Water 

 

The Tsunami is  a closed loop water cooled system and requires  no  utility water services. Do  not 
place  the  chiller above the  laser.   Should the unit not be  installed properly, and a  leak develops, 
dripping w a t e r  may  damage one or both  lasers. The  hoses are 3.6 M  (12ft)  long.  Connect the 
Chiller output  first  to  the  Millennia, from the  Millennia  to the  Tsunami then back to the  chiller. 
You may have the newer model Millennia eV that comes with cooling hoses that splits in parallel to 
cool both components. 

 

Power Requirements 

 

Electrical

 

 

3955/3930

1

 

3955/3930

1

 

Chiller

 

Type

 

Single  Phase

2

 

Single phase

2

 

Single phase

2

 

Voltage

 

110 VAC 

220 VAC 

110 / 220 VAC 

Current

 

<1A 

<0.5A 

10A 

 

Footnote: 

1 – With optional Lok-To-Clock configuration.  

2 – With earth ground. 

 

Power connections 

 

Before connecting the power supply  to the  AC power line, make sure that all the  power supply 
power switches are 

OFF.

 

 

 

 

 

 

Final Check: 

Upon the completion of the installation of utilities, verify  that the services meet 

all building safety codes. 

 

 

 

 

SPECTRA-PHYSICS’ SERVICE ENGINEERS CANNOT PERFORM

ELECTRICAL  OR PLUMBING  WORK AT YOUR SITE.

 

Summary of Contents for Spectra-Physics Tsunami

Page 1: ...Newport Corporation MKS Spectra Physics Confidential 1 of 10 Pre Installation Guide for Tsunami Spectra Physics Inc 3635 Peterson Way Santa Clara CA 95054 April 2020...

Page 2: ...and Environment Continued 5 Physical Description 5 Dimensions and Weights 5 General Specifications 6 Water 6 Power Requirements 6 Power connections 6 General Specifications Continued 7 Nitrogen Purge...

Page 3: ...d to carefully consider your operating environment prior to installation Proper water power and room temperature are required for each system A checklist of pre installation considerations is provided...

Page 4: ...equipment necessary to conduct such tests A non standard system will require special consideration To have other published specifications demonstrated consult with your Service Engineer to determine...

Page 5: ...m stability integrity of the system may be compromised J Consider room requirements for future maintenance and upgrades by your Spectra Physics Field Service Engineer Physical Description Dimensions a...

Page 6: ...the newer model Millennia eV that comes with cooling hoses that splits in parallel to cool both components Power Requirements Electrical 3955 3930 1 3955 3930 1 Chiller Type Single Phase2 Single phase...

Page 7: ...nation but also prevents tuning discontinuities caused by oxygen and water vapor Reduction of the latter is important for operation in the long wavelengths Model 3910 Pressure range is a maximum of 67...

Page 8: ...opper alloys from corrosion It is nitrite free and minimizes the challenge of bacteria control depending on environment and usage If the laser is not going to be used for an extended period turn off t...

Page 9: ...A PPS laser measurement sensor is adequate to measure the optical power The StarLab application together with an Ophir meter turns your PC or laptop into a full fledged laser power energy meter Access...

Page 10: ...e system on your work surface Two or more people may be required to lift some equipment Compare the packing list with your quotation Call your Spectra Physics office about any discrepancies Check that...

Reviews: