Pre-Installation Checklist

 

 

 

 

Physical Locations: 

 

 

A location with adequate clearance around system to conduct service and     
accessible by Spectra

Physics personnel. 

 

A temperature-controlled room. 

 

Utility services have been installed. 

 

Local building and safety codes are in compliance and have been verified. 

 

When Your System Arrives: 

 

 

Check crates for damage. 
(If damaged, file a claim with the carrier and notify Spectra

Physics.) 

 

Uncrate and place the system on your work surface. 
(Two or more people may be required to lift some equipment.) 

 

Compare the packing list with your quotation. Call your Spectra-Physics  
office about any discrepancies. 

 

Check that all manuals were received. 

 

Save all packing and shipping material until the installation has been completed. 

 

Obtain the correct safety glasses and a power meter. 

 
 
 
 

 

 

 

Customer Signature 

Date

 

 
 

 

 

 

 

Phone Number 

Fax Number

 

 

 
 

 

 

 

E-Mail 

Sales Order Number

 

 

 

Before the arrival of your Spectra-Physics Service Engineer please review the 
following pre- installation requirements. When all the requirements have been 
met, initial the boxes and fax a signed copy to the Spectra-Physics Service 
department at 

(408) 980-6921.

 

Summary of Contents for Spectra-Physics 100

Page 1: ...Newport Corporation MKS Spectra Physics Confidential 1 of 11 Pre Installation Guide For all Spirit HighQ 2 Laser Models Spectra Physics Inc 3635 Peterson Way Santa Clara CA 95054 April 2020...

Page 2: ...Instruction Manuals 4 Laser Safety Considerations 4 Diagnostics 4 Pre Installation Considerations 5 Location and Environment 5 Physical Description 6 Utility Requirements 7 Computer Requirements 8 Pr...

Page 3: ...d to carefully consider your operating environment prior to installation Proper water power and room temperature are required for each system A checklist of pre installation considerations is provided...

Page 4: ...ction Manuals Please read the manual to get vital information about your system Familiarize yourself with the system You are encouraged to spend as much time as possible reviewing the system component...

Page 5: ...ons ambient room temperature changes may be an important factor for the laser system s performance Air ducts should not blow directly on laser or optical path E To ensure stable day to day operation t...

Page 6: ...x 6 4 683 x 310 x 163 88 0 40 0 1040 8 SHG Laser Head 29 9 x 12 2 x 6 4 759 x 310 x 163 99 0 45 0 Power Supply 11 0 x 5 7 x 1 9 280 x 144 x 48 5 8 60 3 9 Chiller 15 7 x 19 0 x 10 5 400 x 483 x 267 68...

Page 7: ...ments HighQ 2 Controller 100 240 VAC 50 60 Hz Current 2A Spirit One Power Supply 90 305VAC 47 63 Hz Current 10A Chiller HECR008 100 240VAC 50 60 Hz Current 10A Spirit 4 Spirit 8 Spirit 16 non HE Contr...

Page 8: ...utilize the laser s built in GUI via direct connection to the Spirit head s ethernet port RJ 45 connector HighQ 2 Spirit One Spirit 4 Spirit 8 Spirit 16 Spirit 16HE Spirit 30HE Spirit graphical user i...

Page 9: ...e the system on your work surface Two or more people may be required to lift some equipment Compare the packing list with your quotation Call your Spectra Physics office about any discrepancies Check...

Page 10: ...ing The cleaner should be circulated for a minimum of 8 hours the longer the better if time permits in order to assure thorough cleaning Filters ALPS filter All models except HighQ 2 and Spirit One Wh...

Page 11: ...ntifrogen L coolant solution will ensure a correct coolant level readout of the chiller Fill the chiller reservoir with a mixture of Antifrogen L and distilled water ratio 1 3 Do not use deionized wat...

Reviews: