background image

             mk North America, Inc. 

|

 105-125 Highland Park Drive 

|

 Bloomfield, CT 06002 

|

 860.769.5500 

|

 www.mknorthamerica.com

©2017 

|

 Page 17

8.2 KHL 2045 / KHL 2010

Loosen all bolts and push the entire head (1) inwards (in 
the direction of the arrow), in order to create slack in the 
timing belt.

Remove the closure strip (3) by sliding the material out of 
the end.
This will expose the belt return channel.

Remove the belt return guard (2) by removing all screws.

Do this at BOTH ends of the conveyor.

Next Steps for Belt Removal and Replacement:

•   The belt can now be replaced once all auxiliary obstructions are removed.
• To replace belt, slip it over the side of the conveyor and fit into the return channel.
• Reassemble conveyor in the reverse order.
• Track and tension belt prior to use. (see Section 7).

All work to be performed by qualified personnel only.

Conveyor power must be disconnected before replacing the belt.

CONVEYOR MAINTENANCE - REPLACING THE BELT                                                                                              

Summary of Contents for KHL

Page 1: ...r is located on the frame of the conveyor See section 2 for more details Your serial number is also recorded above or on a designated sheet Ensure the serial number tag above matches the serial number...

Page 2: ...erica com 2017 Page 2 1 General Information 3 2 Decoding Your Serial Number 4 3 Lift Transfer Description 5 4 Warranty Information 6 5 Safety Requirements 7 6 Wear Items Maintenance 9 7 Conveyor Belt...

Page 3: ...ps your conveyor working at its maximum capacity 1 3 If you need assistance If you need assistance there are a variety of ways to get it You can contact our customer service team Monday through Friday...

Page 4: ...as scheduled to ship Type This description refers to the type of unit that is associated with the particular serial number The type should NOT be substituted for the serial number when inquiring DWG T...

Page 5: ...three different Vertical Transfer units but they all have the same main components a mk ZRF P timing belt conveyor mounted to a vertical pneumatic linear actuator KHL 2045 KHL 2010 KHL 2012 Your mode...

Page 6: ...g shipping duties and or any other related costs in the sending or receiving of parts Customer is responsible for all labor associated with sending or receiving of parts No work will be performed by M...

Page 7: ...rth America Inc 105 125 Highland Park Drive Bloomfield CT 06002 860 769 5500 www mknorthamerica com 2017 Page 7 READ AND UNDERSTAND ALL OF THESE WARNINGS PRIOR TO OPERATING EQUIPMENT 5 SAFETY REQUIREM...

Page 8: ...onnel De pressurize the machine s pneumatic equipment before starting any maintenance or repair work Hose lines should be replaced regularly during preventative maintenance even without visible damage...

Page 9: ...ary depending on their relative loads and speeds and which can be significantly influenced by environmental factors All moving components and screw connections should be checked every 6 months All saf...

Page 10: ...rive Bloomfield CT 06002 860 769 5500 www mknorthamerica com 2017 Page 10 6 WEAR ITEMS MAINTENANCE CONT 6 2 KHL 2045 KHL 2010 This vertical transfer system features a ZRF P 2010 timing belt conveyor C...

Page 11: ...e 5 Gearmotor I C Service maintenance per manufacturer s documentation 6 Pneumatic Cylinder I C Service maintenance per manufacturer s documentation 7 Linear Guideway I C Service maintenance per manuf...

Page 12: ...rk Drive Bloomfield CT 06002 860 769 5500 www mknorthamerica com 2017 Page 12 6 WEAR ITEMS MAINTENANCE CONT 6 3 KHL 2012 This vertical transfer system features a ZRF P 2040 timing belt conveyor Cont N...

Page 13: ...I C Service maintenance per manufacturer s documentation 6 Pneumatic Cylinder I C Service maintenance per manufacturer s documentation 7 Linear Guideway I C Service maintenance per manufacturer s docu...

Page 14: ...e belt was tensioned and tracked at the factory Conveyor belts should not require additional tracking once installed It may be necessary to remove the conveyor from the vertical transfer unit before s...

Page 15: ...was tensioned and adjusted at the factory before delivery of the mk product Loosen screws 2 and 4 to pull the entire assembly 1 out arrow direction in order to pretension the timing belt Tighten screw...

Page 16: ...tical transfer unit before servicing Any interfering parts must also be removed Reassemble in reverse order Never operate without all guards in place Always track and tension new belts after installin...

Page 17: ...return channel Remove the belt return guard 2 by removing all screws Do this at BOTH ends of the conveyor Next Steps for Belt Removal and Replacement The belt can now be replaced once all auxiliary o...

Page 18: ...for Belt Removal and Replacement The belt can now be replaced once all auxiliary obstructions are removed see General Remarks Slide the existing belt off the free side of the conveyor frame To replace...

Page 19: ...nd Park Drive Bloomfield CT 06002 860 769 5500 www mknorthamerica com 2017 Page 19 9 NOTES CONTACT INFORMATION 9 1 Record Your Notes 9 2 Contacting mk North America Inc Email sales mknorthamerica com...

Page 20: ...e 2017 mk North America Inc mk North America Inc an mk Technology Group Company 105 125 Highland Park Drive Bloomfield CT 06002 USA Phone 860 769 5500 Fax 860 769 5505 www mknorthamerica com sales mkn...

Reviews: