19
Installation Instructions
1. Replace The 2 hole Chute Clamp with the appropriate washer. (54-68 has 1/2” hole, 75- has
5/8” hole.
Please Note:
the chute bearing is between 2 washers. An SAE Washer on bottom
and a thin Wave Washer on top
2. Bolt Electric Motor unit on top of Chute Base.
3.
Before tightening the bolts, check for binding gears or excessive clearance that may cause
the gears to jam.
4. Finish by tightening the bolts
Washer
Chute Base
By pulling out the knob on the end of the gear shaft and giving it a 1/4 turn, the chute can be
manually rotated to check for jamming.
Electric Chute Rotator
Summary of Contents for Meteor 54
Page 2: ......
Page 23: ...23...
Page 26: ...26 PTO Installation Instructions for Snowblower...
Page 30: ...30 Effective PTO Drive Shaft Maintenance...
Page 36: ...NOTES 36...
Page 38: ......
Page 39: ......