CHAPTER 6
ELECTRICAL SYSTEM
- 27 -
29z
START: Then, depress START switch while continuing to depress PREHEAT switch. When
generator starts, release both switches. Do not crank for more than 20 seconds at a time. Allow
the generator to run for about 15
seconds until LED green light
appears next to “Generator” on AC
Panel below (forward most) indicating
that the panel is receiving electric
current.
ACTIVATE AC PANEL : When the
green LED light appears on AC
Panel, turn ON double Generator
Selector switch. There is a delay until
Volts (about 115) register in the digital
display.
TURN BREAKERS ON for the items
you wish to operate.
Note: if the generator starts, but no AC voltage is seen at the panel, check first that the selector
switches (sliding interlocks) at the top of the AC panel are ON. If so, there is a possibility the
generator was overloaded and the AC breaker on the back of the generator Control Box has
tripped due to a momentary overload. Open the generator hatch and reset (pull up) the AC
Output Circuit Breaker (located on the aft side of the control box).
STOP: Remove electrical load from
the generator set. Allow the engine
to run for a 3-5 minute cool-down
period. Depress STOP momentarily
on the lower part of the rocker switch.
6.9 INVERTER/CHARGER
(
Optional)
There are many functions that are fully explained in the inverter/charger manual. Please read it
thoroughly for a complete understanding of this unit.
Under normal circumstances, the buttons and lights on the inverter/charger unit itself do not need
to be used because the LINK 2000 panel can control most of these functions.
The 29z uses a combination inverter/charger (in a single unit). When a supply of AC power is
present (from shore-power or generator), the unit can charge both the house battery bank and the
engine start battery. The inverter breaker (on the AC panel) should normally be ON. If no source
of AC power is available, the inverter when ON can use DC power from the house bank to create
AC power, used for items on AC Panel. If AC power becomes available, either from shore-power
or the generator, the inverter/charger transfers this power to the AC panel. Your batteries will not
AC & AVR Circuit
Breakers Behind
Control Box