![Mixergy MDC0014-02 Installation And Commissioning Instructions Download Page 5](http://html1.mh-extra.com/html/mixergy/mdc0014-02/mdc0014-02_installation-and-commissioning-instructions_1812639005.webp)
5
Installation: mechanical
1. Remove the front cover of the PV switch.
2. Mount the PV switch either to the side wall of the cylinder (using
the included self-drilling screws) or to a nearby wall (using the
included plastic spacers).
3. Remove the cover/cap on the primary immersion heater.
Disconnect the Mixergy controller’s immersion supply cable from
the immersion’s terminals.
1
3
3 (SLIM)
2