SECTION 5: INSPECTION AND MAINTENANCE
40
1.3 Reagent Cartridge Replacement Method
NOTE
• Replace the reagent cartridge while the power is supplied to the device. Close the sample
water collecting ball valve and replace while monitoring standby period.
• When install the reagent cartridge, attach the D-ring first. To install D-ring to the reagent
cartridge, dip the D-ring into water.
• If the reagent cartridge is removed from the device other than replacement and put it back, do
not push the “Manual Monitor (Buzzer Stop)” switch for about 60 sec. after install the old
reagent cartridge. If you press the “Manual Monitor (Buzzer Stop)” switch soon after
installation, the reagent cartridge replacement timer counter will be reset.
Reagent cartridge replacement
Cartridge OFF
(1) Pull out the cartridge lever to unlock.
(2) Hold the regent cartridge by both hands and pull up to
remove from the device. (Buzzer starts sounding.)
(3) Press the “Manual Monitor”
switch to stop the buzzer.
(4) Insert the new reagent cartridge to the device
securely. (Buzzer starts sounding again.)
(5) Push the cartridge lever
back in to lock.
SW ON Cfm
(6) Press the “Manual Monitor”
switch to stop the buzzer.
Check process
Self Check
* Press the “Manual Monitor”
switch within 60 seconds
after the buzzer starts
sounding.
Figure 5-1: Reagent cartridge replacement
(1)(5)
(3)(6)
(2)
(4)
D-ring
Cartridge OFF
SW ON Cfm
Self Check
Summary of Contents for CMU-324HE
Page 2: ...Release date June 2018...
Page 26: ...SECTION 2 OVERVIEW 18 2 2 Reagent Cartridge Reagent injection nozzle D ring Tube Check tube...
Page 59: ......
Page 60: ......