
ENGINE Cvlinder Head and Valve SOHC
1
1
VALVE SPRINGS
Measure the free height of the spring and, if it is smaller
than the limit, replace.
Standard value:
SOHC
49.8 mm (1.961 in.)
DOHC
up to
1992 models
45.2 mm (1.780 in.)
From
1993 models
46.4 mm (1.827 in.)
Limit:
SOHC
48.8 mm (1.921 in.)
DOHC
up to
1992 models
44.2 mm
in.)
From
1993 models
45.4 mm (1.878 in.)
(2) Measure the squareness of the spring and, if the limit is
exceeded, replace.
Standard value:
Limit: 4”
VALVE GUIDES
(1) Measure the clearance between the valve guide and valve
stem. If the limit
is
exceeded, replace the valve guide or
valve, or both.
Standard value:
Intake
0.03 0.06 mm
in.)
Exhaust
0.05 0.09 mm
in.)
Limit
Intake
0.10 mm
in.)
Exhaust
0.15 mm
in.)
VALVE SEAT RECONDITIONING PROCEDURES
(1) Before valve seat reconditioning, check the valve
guide clearance.
(2) Recondition the valve seat with a seat grinder or cutter. The
valve seat width should be the specified value at the center
of the valve face.
Inspect the valve seat with prussian blue to determine
where the valve contacts the seat. To do this, coat the valve
seat lightly with prussian blue, and then set the valve in
place.
Rotate the valve with a light pressure. If the blue is
transferred to the center of the valve face, contact is
satisfactory.
If the blue is transferred to the top edge of the valve face,
lower the valve seat with a 30 degrees stone or cutter. If
the
blue is transferred to the bottom edge of the valve face,
raise the valve seat with a 65 degrees stone or cutter.
Valve seat diameter:
Intake
44 mm (1.73 in.)
Exhaust
38 mm (1.50 in.)
Seat width: 0.9 1.3 mm
in.)
(3) The valve and valve seat should be lapped with lapping
compound.
TSB Revision
Summary of Contents for 4G1 series
Page 2: ......
Page 11: ...4Gl ENGINE General Information TSB Revision 1 ...
Page 12: ...VA 4 4Gl ENGINE General Information UBRICATION SYSTEM P 0 Z t7 ii ii I OTJ 09 1 TSB Revision ...
Page 21: ...4Gl ENGINE Special Tools Valve stem seal compressor Flywheel stopper 1 TSB Revision ...
Page 46: ...1 IA 38 461 ENGINE Cvlinder Head and Valves TSB Revision ...
Page 62: ...N O T E S ...
Page 65: ...4G3 ENGINE General Information pqJp3 I 3EN0087 TSB Revision ...
Page 66: ...IIB 4 4G3 ENGINE General Information JBRICATION SYSTEM 3LUOO20 TSB Revision ...
Page 77: ...463 ENGINE Special Tools Removal of crankshaft sprocket 1 TSB Revision ...
Page 106: ...11 B 44 4G3 ENGINE Cylinder Head and Valves 3EN018E TSB Revision ...
Page 127: ...4G6 ENGINE 1992 General Information 6EN0314 TSB Revision I ...
Page 128: ...IIC 4 466 ENGINE 1992 General Information NGlNE SECTIONAL VIEW DOHC TSB Revision ...
Page 129: ...6EN0244 TSB Revision ...
Page 225: ...4G6 ENGINE 1992 Piston and Connecting Rod 1 IC 101 TSB Revision ...
Page 232: ...NOTES ...
Page 235: ...4G9 ENGINE General Information llD 3 ru l 9EN0105 TSB Revision ...
Page 236: ...11D 4 4G9 ENGINE General Information UBRICATION SYSTEM 9EN0106 TSB Revision ...
Page 284: ...NOTES ...
Page 287: ...6G7 ENGINE General Information llE 3 TEN0324 1 Revision ...
Page 289: ...667 ENGINE General Information TSB Revision 7EN0120 I ...
Page 290: ...WE 6 6G7 ENGINE General Information SECTIONAL VIEW DOHC NON TURBO ENGINE TSB Revision 7EN0325 ...
Page 291: ......
Page 292: ...IIE 8 6G7 ENGINE General Information SECTIONAL VIEW DOHC TURBO ENGINE 1 TSB Revision 7EN0335 ...
Page 293: ...667 ENGINE General Information IIE 9 TSB Revision 7EN0334 ...
Page 409: ...4G6 ENGINE 1993 General Information TS8 Revision 6EN0630 ...
Page 411: ...466 ENGINE 1993 General Information 6EN0614 TSB Revision ...
Page 412: ...4G6 ENGINE 1993 General Information ENGINE SECTIONAL VIEW DOHC 6EN0619 TSB Revision ...
Page 413: ...4G6 ENGINE 1993 General Information I W7 6EN0620 TSB Revision ...
Page 522: ...NOTES ...