113
-
Airtighteness test completed
Vacuuming begins
Vacuuming completed
Vacuum gauge check
When the vacuum gauge's needle pointer creeps up, there is moisture left in the system
or a leak. Pull air again after you have checked the system for a leak and rectified it. Use
a reverse flow stop adapter to prevent the vacuum pump's lubricant oil from flowing into
the refrigerant system.
Please run the vacuum pump for at
least one hour after the vacuum gauge
shows -101kPa or lower. (-755mmHg
or lower)
No increase in the reading of the
vacuum gauge's needle pointer.
(3)
Air tightness test and air purge
●
Always use a vacuum pump to purge air trapped within an indoor and the refrigerant piping.
(a)
Air tightness test
1) When all the flare nuts on both indoor and outdoor unit sides are fastened. Conduct an air-tightness test from the service
valves (on both liquid and gas sides) closed tightly to check whether the system has no leaks.
2) Use nitrogen gas in the air-tightness test. Do not use gas other than nitrogen gas under any circumstances.
Conduct the air-tightness test by applying 4.15MPa of pressure.
3) Do not apply the specified pressure at once, but increase pressure gradually.
a) Raise the pressure to 0.5 MPa, and then stop. Leave it for five minutes to see if the pressure drops.
b) Then raise the pressure to 1.5 MPa, and stop. Leave it for five more minutes to see if the pressure drops.
c) Then raise the pressure to the specified level (4.15 MPa), and record the ambient temperature and the pressure.
d) If the pressure does not drop after the units is left for approximately one day, the airtighteness is acceptable.
When the ambient temperature changes 1˚C, the pressure also changes approximately 0.01 MPa. The pressure. if
changed, should be compensated for.
(b)
Air purge
When a vacuum air purge is completed, remove the valve rod cap nuts and open the service valves (both liquid and gas sides)
as illustrated below. After you have made sure that the valves are in the full-open position, lighten the cap nuts (for the valve
rads and charge ports).
Pay attention to the following points in addition to the above for the R410A and compatible machines.
To prevent a different oil from entering, please assign dedicated tools, etc. to each refrigerant type. Under no circum-
stances must a gauge manifold and a charge hose in particular be shared with other refrigerant types (R22, R470C, etc.).
Use a counterflow prevention adapter to prevent vacuum pump oil from entering the refrigerant system.
Charge port
Vacuum
pump
Gas service valve
In-unit check joint
Charge hose (for R410A only)
-101kPa (-755mmHg)
Compound pressure gauge
Pressure gauge
Gauge manifold
(for R410A only)
Handle Hi
Charge hose
(for R410A only)
Charge valve
Vacuum adapter
(for R410A only)
Handle Lo
Liquid service valve
(with a charge port)
• You can purge air with either liquid operation valve or gas
operation valve.