18
Unit : mm
SEZ-KC25VA
Make the access door at the appointed position properly
for service maintenance.
Ceiling surface
Access door
Required space for service and maintenance
Lifting plate
(4-14
%
30)
Air filter
80
Control box
T
erminal
bed
(Power source)
Bottom plate
23
664(Lifting bolt pitch)
710
The part air intake duct is attached.(
+
3)
(When the air intake duct is used)
610
50
150
790
582
204.5
42.5
30
225(
+
2)
15
148
13.5
50
50
510
14
127
56.5
(52)
(57)
12
9
55
301
301
189
Detailed chart around the air intake duct flange(
+
3)
(Duct and flange should be supplied in the field.)
550(
+
1)
More than 20mm
More than 20mm
6-
:
3hole
55
50X11=550
16
2X12-
:
3hole
14
459
(Lifting bolt pitch)
15
11
3
Air outlet
Air inlet
450
50~150
300
450
2X3-
:
3hole
25
500
50~150
Note
1.
Use M10 screw for the lifting bolt (field supply).
2.
Keep the service space for the maintenance from the bottom
when the heat exchanger is cleaned.
3.
The direction of air intake can be changed from the bottom to
the rear by attaching the bottom plate to the air intake side.
4.
Drain Pan is changeable from right and left.
5.
The dimension is changed, in case the optional long-life filter
is attached.
Rear
Air-Intake spec.
:Depth is increased by 30mm(
+
1)
Bottom
Air-Intake spec.
:Height is increased by 30mm(
+
2)
Refrigerant piping flare connection
(gas
:
9.52 copper tube):LP
········
Refrigerant piping flare connection
(liquid
:
6.35 copper tube):HP
········
Drain piping connection R1 (External thread)
········