150
Photo 16
Reactors
Photo 17
Reactors
Lead wires of reactors
Reactors
Figure 2
Reactor box fixing screw (front)
Reactor fixing screws (front)
Reactor box fixing screw (front)
12. Removing the reactors (ACL1, ACL2, ACL3)
(1) Remove the service panel. (See Photo 1)
(2)
Remove the reactor box fixing screws. (2 for front, 2 for
rear, 4 × 10).
(3) Disconnect the lead wires from the reactor. (See Photo 17)
(4)
Remove each fixing screws (2 for front, 2 for rear, 4 × 10)
of 3 reactors.
Note
1:
The reactor is very heavy (4 kg) !
Be careful when handling it.
Note 2: The reactor box is also removable.
OPERATING PROCEDURE
PHOTOS
OCH451D